Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
|
Stockholm Bypass, tunnel safety studies
|
|
|
|
Elimination bottleneck north-south artery A2(E25): Providing safety measures in the urban highway tunnel in Maastricht
|
|
|
|
|
|
Elaboration of the project for obtaining the building permit for the Drazenci-International Border Crossing Gruskovje motorway section
|
|
|
|
Road E18 Helsinki - Vaalimaa studies
|
|
|
|
Completion of the study Ionian Highway (Western Axis) from the end of concession to Kakavia
|
|
|
|
A8 Belfast to Larne (Coleman's Corner to Ballyrickard Road)
|
|
|
|
A6 Randalstown to Londonderry (Londonderry to Dungiven)
|
|
|
|
A14 Corridor Traffic Management Scheme
|
|
|
|
Pre-investment study for motorway D1 Budimir-Bidovce
|
|
|
|
|
|
E6.21 Partihall Connection
|
|
|
|
Elaboration of the project documentation for reconstruction of the national road n°1 to an expressway on the section Podwarpie-Drąbrowa Gómicza
|
|
|
|
Elaboration of the technical documentation for S1 Expressway construction on the section from Kosztowy II Interchange in Myslowice to Suchy Potok Interchange in Bielsko-Biala
|
|
|
|
Elimination bottleneck north-south artery A2 (E25): Building the urban highway tunnel in Maastricht
|
|
|
|
Integration of Riga City and Riga Port into the TEN-T network; construction of Viestura-Meza interchange
|
|
|
|
Upgrading the S.Pellegrino Tunnel (SS n.675 Umbro-Laziale) and the Colle Capretto Tunnel (SS n.3bis Tiberina) on the E45 to the safety requirements for tunnels in the Trans-European Road Network
|
|
|
|
Rome Ring Road Motorway northwestern section upgrade to three lanes in both directions from km 11+250 to km 12+650 completion works
|
|
|
|
Main Road 5 between Lusi and Mikkeli (lacking road improvements)
|
|
|
|
Prolongation of E-90 (Spanish Express Route Baix Llobregat). Section: Ronda Litoral A-16
|
|
|
|
Express Route SE-40 (Sevilla): section connection A-49 (Huelva)-Almensilla-Coria del Rio-Dos Hermanas
|
|
|
|
Express Route A-32. Section Torreperogil-Villanueva del Arzobispo
|
|
|
|
BAB A3, Frankfurt-Nürnberg, renewal of the bridge over the Main river at Randersacker
|
|
|
|
Motorway D47 section 47092 Bohumín-state border Czech Republic/Poland
|
|
|
|
Widening to six lanes the motorway section Ayia Varvara-Nicosia
|
|
|
|
Works for the upgrading of the Road E6 Trelleborg-Vellinge
|
|
|
|
Norrköping Intermodal Infrastructure Package Road Bypass Norrköping, Study
|
|
|
|
Upgrading the Montecrevola Road Tunnel on the SS
n. 33 del Sempione E62 to the safety requirements for tunnels in the Trans-European Road Network
|
|
|
|
Studies for upgrading the E18 Road
|
|
|
|
Works for the construction of the Road E18 Muurla-Lohja
|
|
|
|
|
|
Highway A-73 Burgos-Santander. Works in the section Quintanilla-Quintanaortuño
|
|
|
|
Technical design studies: Duero A-11 highway, section Zamora north-Portuguese border
|
|
|
|
Technical design studies: Ruta de la Plata A66, section Benavente-Zamora Norte
|
|
|
|
Designs for the upgrading-completion of the Serres-Kavala axis (Phase A: Completion of 1st section Serres ring road)
|
|
|
|
Designs for the connection of Egnatia/Pathe highways (PP 07) with Macedonia Airport of Thessaloniki (Phase B)
|
|
|
|
Highway A3, 6-lane extension in the section AS Hösbach to Kauppenbrücke
|
|
|
|
Six-lane widening of the A8 federal highway Karlsruhe-Munich, in the section Pforzheim-Süd/Wurmberg to Heimsheim
|
|
|
|
Package for improvements and upgrade of road infrastructure on Priority Project 13: sections of A14, M6 and A1
|
|
|
|
|
|
Works for construction of the road section Norra Lanken
|
|
|
|
Design documentation, building design, tender dossier for S5 expressway, sections: Nowe Marzy-Bydgoszcz and Żnin-border of wielkopolskie Voivodship and border of kujawsko-pomorskie Voivodship-Gniezno
|
|
|
|
Materials for environmental decision, materials
for localisation decision, building design and
tender documentation for the building of the
S19 expressway, section Lutoryz-Barwinek
|
|
|
|
Integration of Riga City and Riga Port into the TEN-T network: Completion of studies for Riga Northern Transport Corridor
|
|
|
|
Development of IA Transport Corridor
|
|
|
|
Autovía BU-30, Tramo: Quintanadueñas-Villatoro-Villímar
|
|
|
|
Navarra A-15 Highway: Sections Radona-Sauquillo and Almazán-Cubo
|
|
|
|
Ionian Highway (Western Axis) from the end of concession to Kakavia
|
|
|
|
Studies for the development of the motorway project of PP7 (Igoumenitsa/Patras-Athens-Sofia-Budapest Motorway Axis)
|
|
|
|
Studies for the vertical access Thessaloniki-Serres-Promachonas
|
|
|
|
Environmental Impact Assessment on the extension of Motorway E47/E55 (Helsingør Motorway) and Motorway E20/E47/E55 (Køge Bugt Motorway)
|
|
|
|
The Marselis Tunnel Project - Aarhus, Denmark
|
|
|
|
Six-lane extension of the federal motorway A6 Walldorf-Weinsberg in the stretch of line Heilbronn/Untereisesheim-Weinsberg
|
|
|
|
Construction of the Bridge over the Hasel valley
|
|
|
|
Pre-Investment Studies for the Motorway D1- section Jablonov-Studenec
|
|
|
|
Technical project and special socumentation for the motorway section Slivnica-Ptuj (Draenci)-Grukovje-Part of Phyrn motorway route
|
|
|
|
Documentation for the decisions on environmental conditions for realisation of the investment for A-2 motorway, section Warszawa-Kukuryki
|
|
|
|
Basic technical documentation, documentation for the location decisions and decisions on environmental conditions of realisation of the investment for A-4 motorway, section Przeworsk-Korczowa
|
|
|
|
Technical documentation for the construction of S-69 expressway Bielsko Biała-Żywiec-Zwardoń, section Przybędza-Milówka (Węgierska Górka bypass)
|
|
|
|
Construction, design and tender documentation for the southern bypass of Gdańsk (Tricity-Koszwały section) along with detailed technical documentation for the S-7 road (section Koszwały-Kazimierzowo)
|
|
|
|
Construction and tender documentation for motorway A-4, section Tarnów-Rzeszów and expressway S-19, section Rzeszów-Lutoryż
|
|
|
|
Studies for M8 Motorway, Section I Lepsény-Dunaújváros and Section II Dunavecse-Kecskemét
|
|
|
|
Completion updating of studies, supplementary studies for the conversion of the national road Athens-Korinthos (section Daphni-O.J. section with old national road Elefsina-Thiva (ONRET)) to a motorway (phase A)
|
|
|
|
Preparatory Studies for the environmentally compliant crossing of the Elbe as part of the A20 near Glückstadt
|
|
|
|
Pre-investment studies for Motorway D3 Cadca-Svrcinovec
|
|
|
|
Studies Motorway M1 Turany-Hubova
|
|
|
|
IP8 Studies (second phase) Motorway connection from the coast (Sines) to the border (Vila Verde de Ficalho)
|
|
|
|
Design study for construction and tender documents for motorway A1 section Toruń-Stryków
|
|
|
|
Feasibility studies for S-1 expressway section from Kosztowy II interchange in Myslowice to Suchy Potok interchange in Bielsko-Biala
|
|
|
|
Design study for construction and tender documents for motorway A1 - Section Pyrzowice - Maciejów, including environmental preparation material and geological documentation
|
|
|
|
Study for M43 motorway II. Phase Makó-Nagylak/ Csanádpalota
|
|
|
|
Pre-investment study for the motorway D3 Svrčinovec-Skalité
|
|
|
|
Feasibility study and geological documentation for a stretch of a toll motorway A1 Strykow-Czestochowa-Pyrzowice, including traffic analysis
|
|
|
|
Construction works on the A11 motorway Berlin-Polish border
|
|
|