Rail projects aim to ultimately create a safe and high-quality infrastructure, by ensuring network continuity and interoperability.
Many TEN-T rail projects are devoted to the implementation of common technical standards and the European Rail Traffic Management System (ERTMS), a command and control system recommended for the European railway network.
Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
|
PP26: North West England electrification, Manchester-Liverpool
|
|
|
|
Removing a bottleneck on the Northern Ireland rail network: Coleraine-Derry
|
|
|
|
Western link - railway tunnel in Gothenburg
|
|
|
|
Bothnian Corridor -East Coast Line - increased capacity meeting stations
|
|
|
|
Bothnian Corridor - East Coast Line - increased capacity. Study new line Stangan-Dingersjo
|
|
|
|
Modernisation of rail section Warszawa Włochy-Grodzisk Mazowiecki: preparatory studies
|
|
|
|
Development of ERTMS/ETCS Level 1 system on the E20/CE20 line, at the Kunowice-Warsaw section
|
|
|
|
Retrofitting of 9 ES64U4 "Husarz" (EU44) locomotives with ETCS SRS 3.x.0 and line tests on the railway infrastructure equipped with ETCS Level 1 and 2 SRS 2.3.0 in Poland, Czech Republic and Austria
|
|
|
|
Freight corridor Betuweroute-southeast Netherlands-Germany (Corridor I)
|
|
|
|
Prototyping, testing, renewed authorisation for placing in service and the retrofit of Siemens ES64U2 locomotives with ETCS L1/L2 2.3.0.d for Corridor A, B and E networks in DE, AT, HU and CH
|
|
|
|
Implementation and testing of the interface between the German Baseline 3 system and the Dutch 230d ERTMS systems
|
|
|
|
Preliminary design of Latvian railway network electrification
|
|
|
|
Bologna AV/AC rail node: construction of a rail section between the node and the Venice line to streamline traffic
|
|
|
|
Turin-Padua: technological improvements to the efficiency of the Milan railway junction
|
|
|
|
Genoa rail node: improvement of the traffic management systems
|
|
|
|
Treviglio-Brescia HS/HC section: civil works phase
|
|
|
|
Upgrading of ERTMS system on Trenitalia fleet to 2.3.0.d version
|
|
|
|
Deployment of ERTMS trackside equipment on the Railway Corridor B Stockholm-Naples/Subpart Fortezza to Verona of the Italian Corridor B part (Brennero-Verona-Naples)
|
|
|
|
Project-level studies and archaeological excavations of the 2nd phase of the Rhine-Rhone Eastern Branch
|
|
|
|
Railway bypass round the Lyon conglomeration Studies in preparation for the northern section implementation phase
|
|
|
|
Prototyping, testing, certifying and retrofitting of Alstom Prima locomotives for usage on the TEN T corridors
|
|
|
|
Improving of punctuality/reliability of passenger train traffic
|
|
|
|
EU Regulation No. 913/2010 concerning a European Rail Network for competitive freight: implementation of Rail Freight Corridor #4
|
|
|
|
Studies, managerial structures and activities for the establishment of the Rail Freight Corridor 6 in line with Regulation (EU) No 913/2010.
|
|
|
|
Preparatory studies and activities of the RFC8 organisational structures Bremerhaven/Rotterdam/Antwerp-Aachen/Berlin-Warsaw-Terespol (Poland-Belarus border)/Kaunas for the corridor to become operational by 10 November 2015
|
|
|
|
Studies, managerial structures and activities for the establishment of Rail Freight Corridor 2
|
|
|
|
Facilitating and speeding up ERTMS deployment
|
|
|
|
Simulation Environment for Fast ERTMS Validation
|
|
|
|
Study and implementation of major parts of the Corridor Freight Regulation 913/2010
|
|
|
|
ERTMS upgrade to ETCS Baseline 2 (version 2.3.0d) for the Perpignan-Figueras high speed line
|
|
|
|
Preparatory studies for the implementation of additional measures on ERTMS Corridor Rotterdam-Genoa and ERTMS Corridor Antwerp-Basel-Lyon
|
|
|
|
Adaptation of the Port of Barcelona railway network to standard (UIC) gauge
|
|
|
|
Track bed works of the sub-sections Amorebieta/Etxano-Lemoa and LemoaGaldakao
|
|
|
|
Platform Works and services for follow-up works on subsection Amorebieta/Etxano-Amorebieta/Etxano
|
|
|
|
Works on the platform subsection Durango-Amorebieta/Etxano and services for follow up works
|
|
|
|
Track bed works of the sub-section Venta de Baños junction: Valladolid-Burgos and Leon-Palencia-Burgos connections and services for follow up works
|
|
|
|
ERTMS Deployment on the Madrid-Castilla la Mancha-Comunidad Valenciana-Murcia high speed line. Albacete-Alicante section
|
|
|
|
Upgrade of Spanish HS Lines and Trains to ERTMS 2.3.0.d
|
|
|
|
Remaining studies to complete the upgrading of the main rail axis Athens-Thessaloniki in the section ATHENS R.S. (KM 9+700 ) - AHARNES ATTICA (KM 22+300)
|
|
|
|
First phase of detailed planning studies - programme phase - for upgrading the railway access lines to the future Fehmarn Belt fixed link - from Ringsted to Roedby
|
|
|
|
Detailed planning phase studies of removing the bottleneck of the railway section between Vamdrup and Vojens
|
|
|
|
VDE 8.1, 4-track extension of the Eltersdorf-Paul Gossenstraße section
|
|
|
|
Hochrustung der Strecke Berlin - Halle/Leipzig (VDE 8.3) von ETCS Level 2 (SRS 2.2.2+) auf ETCS Level 2 (SRS 2.3.0d)
|
|
|
|
TEN-T PP17: Salzburg-Vienna section, high speed extension of the Westbahn - works for the St. Polten freight train pass
|
|
|
|
TEN-T PP17: Salzburg-Vienna section, high speed extension of the Westbahn - Lambach-Breitenschutzung line improvements and works
|
|
|
|
TEN-T PP17: Salzburg-Vienna section, high speed extension of the Westbahn - closing the gap east of Amstetten station
|
|
|
|
Priority Axis 26: Nuneaton North Chord and Kennett Re-signalling Works
|
|
|
|
Elaboration of the executive design for upgrading of the section of the railway line Poljcane-Pragersko
|
|
|
|
Completion of the Haparanda Line - an important link in the Bothnian Corridor
|
|
|
|
Studies supporting the PPP programme for high speed rail implementation in Portugal
|
|
|
|
Studies for the Alcântara rail grade separation
|
|
|
|
Feasibility study for the modernisation and extension of the Katowice railway junction
|
|
|
|
Studies concerning the extension railway yard Maasvlakte West- Phase 1
|
|
|
|
Studies concerning the construction of the third Track Zevenaar-German border
|
|
|
|
Adaptation of the existing line between Mulhouse and the border for use by high-speed (TGV) or intercity express (ICE) trains on the Mulhouse-Mullheim (Freiburg) corridor
|
|
|
|
Railway Kokkola-Ylivieska, PPP procurement process
|
|
|
|
|
|
Studies on improving the Freight Corridor Concept by using Telematic Applications for Freight, and methods, tools and procedures developed by RNE for rail corridors
|
|
|
|
High speed line Bobadilla-Granada. Studies and pre-design studies
|
|
|
|
High speed railway line Basque country-French border. Drafting of design studies
|
|
|
|
PP High speed railway line Madrid-Lisbon. Sub-section Madrid Oropesa. Studies (phase 1)
|
|
|
|
Felixstowe-Nuneaton route work
|
|
|
|
ETCS deployment on Corridor VI:Zilina-Cadca-State Border SK/CZ
|
|
|
|
Nordic Triangle-Malmö C-completion works
|
|
|
|
Deployment of ERTMS in Sweden
|
|
|
|
Detailed design studies for the high speed railway section Poceirão-Évora, part of the Lisbon-Madrid axis
|
|
|
|
Detailed design studies for the high speed railway section Moita-Poceirão, part of the Lisbon-Madrid axis
|
|
|
|
Studies for the implementation of the Portuguese high-speed rail network PP3 and PP19
|
|
|
|
Implementation of the European Rail Traffic Management System on the high speed stretch between Lisbon and Caia, an integral part of the Lisbon-Madrid
|
|
|
|
Preparatory works for the implementation of the connection between the third Tagus crossing and the Oriente-Lisbon station
|
|
|
|
Project and development of ETCS level 1 system at the section of the E65,CMK, railway line, Grodzisk Mazowiecki-Zawiercie
|
|
|
|
Retrofitting of ETCS onboard equipment for locomotives to run in ERTMS Corridor A
|
|
|
|
Fitting of ETCS onboard equipment to Traxx DABNLs
|
|
|
|
ERTMS upgrade of existing locomotives to ensure compatibility with SRS 2.3.0d for use in the Betuwe line
|
|
|
|
Upgrade of ETCS system to 2.3.0d in the Betuwe Route
|
|
|
|
Optimising rail connection Port of Amsterdam-European Hinterland (ORCAEU) - Elimination of missing links for intermodal freight transport
|
|
|
|
Upgrade of the Tortona-Voghera section, Priority Project 24, Final Design
|
|
|
|
Deployment of ERTMS trackside equipment on the Railway Corridor B Stockholm-Naples: Sub-part from Brenner to Verona of the Italian Corridor B part (Brenner-Naples)
|
|
|
|
Upgrade of Roma-Napoli and Torino-Novara high speed lines in order to ensure compatibility with ERTMS version 2.3.0d
|
|
|
|
Hub of Torino, section Susa-Stura, Priority Project 6, removal of bottleneck
|
|
|
|
Rome Hub, Priority Project no. 1 - upgrade of Rome Tiburtina Station
|
|
|
|
Retrofitting of MÁV-TRAKCIÓ locomotives with ETCS equipment to be operated on Corridor E
|
|
|
|
High speed line Bretagne-Pays de la Loire
|
|
|
|
Migration of the French East European high speed line to Specification Baseline 2.3.0.d
|
|
|
|
New high speed railway line "LGV Est" - second phase: section Baudrecourt-Vendenheim
|
|
|
|
Programme management office for the ERTMS deployment on the corridor from Rotterdam to Genoa
|
|
|
|
Support to the ERTMS Consolidation
|
|
|
|
Deployment of ERTMS on Corridor D: Valencia to Budapest
|
|
|
|
ERTMS implementation on the Railway Corridor C (Antwerpen-Lyon/Basel)
|
|
|
|
High speed railway line Paris-Madrid: section Mondragón-Elorrio
|
|
|
|
High speed railway line Madrid-Exremadura-Lisboa: studies and projects section Talayuela-Cáceres, phase II
|
|
|
|
Madrid-Galicia high speed mixed traffic rail section: La Hiniesta-Perilla-Otero de Bodas-Cernadilla
|
|
|
|
High speed line Valladolid-Burgos-Vitoria. Track bed works for sub-sections: Nudo Norte de Valladolid-Cabezón de Pisuerga, San Martín de Valvení-Nudo de Venta de Baños y Torquemeda-Quintana del Puente
|
|
|
|
Equipment with electronic interlocking of the railway line between Emmerich (Dutch-German border) and Basel (German-Swiss border), within Corridor A Rotterdam-Genoa
|
|
|
|
New railway line (NBS) Ebensfeld-Erfurt: sections in Bavaria (BA 3121 Füllbachtal bridge, BA 3122 Fornbach bridge)
|
|
|
|
Modernisation of railway section Veseli and Luznici-Tábor-II part, Veseli and Luznici-Doubi u Tábora-detailed design
|
|
|
|
Modernisation of the Tábor-Sudoměřice u Tábora line - detailed design
|
|
|
|
Modernisation of the Nemanice-Sevetin railway section - preliminary design
|
|
|
|
Rail Corridor E ERTMS/ETCS in the section of German border-Decín-Prague-Kolín
|
|
|
|
ERTMS deployment on Corridor B (Stockholm-Naples) Austrian vehicles
|
|
|
|
ERTMS deployment on Corridor E (Dresden-Constanta) Trackside equipment
|
|
|
|
ERTMS deployment on Corridor E (Dresden-Constanta) Austrian vehicles
|
|
|
|
Four-track development of the Western Line, construction project Ybbs-Amstetten, Burgstaller Tunnel (skeleton construction)
|
|
|
|
Four-track development of the Western Line Vienna-Salzburg: gap closure St. Pölten-Loosdorf (freight rail bypass) bridge construction works
|
|
|
|
Four-track development of the Western Line Vienna-Linz: Melk railway station
|
|
|
|
Ballymena-Derry: track life extension
|
|
|
|
Modernisation of corridor, state border CR/SR Cadca-Krásno nad Kysucou (outside) railway track
|
|
|
|
Working out of preliminary studies for the construction of the new line of high capacity/high speed line Ljubljana-Zidani Most
|
|
|
|
Working out of preliminary studies for the construction of the new line of high capacity/high speed line Divača-Ljubljana
|
|
|
|
Nordic Triangle - Reconstruction of Malmö Central
|
|
|
|
Nordic Triangle: Götaland Line - (Borås-Jönköping-Linköping) - High Speed Line
|
|
|
|
Preliminary feasibility study for the task: modernisation and expansion of the Katowice railway junction
|
|
|
|
Deployment of ETCS Level 1 on Luxembourg railway network
|
|
|
|
Completion of final design of the Treviglio-Brescia Section, on the Milano-Verona high speed/high capacity line
|
|
|
|
Removal of the bottleneck of Cattolica tunnel to allow the transit of high-cube container trains along the Adriatic Corridor
|
|
|
|
Rail project Lyon-Turin: studies on French access routes to base tunnel
|
|
|
|
High Speed Line Provence-Alpes-Côte d'Azur (HSL PACA)
|
|
|
|
National Railway Yard (Ilmala)
|
|
|
|
|
|
Feasibility study on international rail real time traffic monitoring and electronic path request systems
|
|
|
|
Corridor linking Madrid-Zaragoza-Barcelona-Figueras-Perpignan-Montpellier-Nimes: Railway bypass of Figueras
|
|
|
|
Upgrading of the Barcelona-France line and access for operating an international gauge
|
|
|
|
High Speed railway Madrid-Galicia-Portugal. Works in the section Olmedo Pozal
|
|
|
|
Studies and projects for the development of the rail section Talayuela-Cáceres
|
|
|
|
Preliminary planning for the electrification of Markt Schwaben-Tüßling-Freilassing
|
|
|
|
Studies for the removal of the level crossings on the section Oberhausen-Emmerich
|
|
|
|
Optimisation of Railway section Prague Hostivar - Prague main railway station detailed design
|
|
|
|
Implementation of the GSM-R system in Slovenian railway network
|
|
|
|
|
|
Nordic Triangle: Ostlanken (Jarna-Linköping)
|
|
|
|
Works for construction of City tunnel project
|
|
|
|
Studies and works in the high speed railway axis of southwest Europe (PP3) - Lisbon-Madrid axis: Third Tagus Crossing (TTC)
|
|
|
|
Retrofit of 90 Siemens ES64F4 E-locomotives with Alstom ETCS L2 equipment for usage on EU freight corridors and various conventional networks
|
|
|
|
ERTMS implementation the Railway Corridor Rotterdam-Genoa- Netherlands part - Section Port Railway of Rotterdam
|
|
|
|
Serial fitment of onboard ETCS equipment SRS 2.3.0 in 109 freight locomotives
|
|
|
|
ERTMS implementation on the railway corridor Rotterdam-Genoa-Netherlands Part - Kijfhoek & Zevenaar
|
|
|
|
Works for replacement of legacy systems by 15/25 kVAC on two remaining sections in the Netherlands of the railway corridor Rotterdam-Genoa
|
|
|
|
1) Reconstruction/upgrading: cross-border section north Valmiera-Valka and cross-border section south Jelgava-LT border 2) Reconstruction/upgrading Sigulda-Valmiera
|
|
|
|
Studies for a European gauge line (Latvian studies)
|
|
|
|
EuroCap-Rail: modernisation of the Brussels-Luxembourg-Strasbourg rail axis
|
|
|
|
Studies for Rail Baltica, Lithuanian part
|
|
|
|
1) Upgrading of existing railway line on the cross-border section PL/LT state border-Marijampole 2) Cross-border section Siauliai - LV border. Reconstruction/upgrading
|
|
|
|
Preliminary and detailed design for the rehabilitation of a railway link between Civitavecchia Port and TEN-T Priority Axis no. 1 in Orte
|
|
|
|
Trackside ERTMS equipment on Italian part of Corridor A (600 km)
|
|
|
|
Migration towards ERTMS/ETCS for Trenitalia on-board equipment
|
|
|
|
Railway node of Genova - Study for upgrading
the section Genova Voltri-Genova Brignole
|
|
|
|
Section Ronchi Sud-Trieste: Priority Project 6 national section
|
|
|
|
Southern Access line to Brenner
|
|
|
|
Dublin Interconnector Tunnel Study - Design and Railway Order Phase
|
|
|
|
FEREX - Ferihegy Express - Preparation study of a PPP project for railway link between Budapest city centre and Budapest Ferihegy (TEN-T) International Airport
|
|
|
|
Preparation of design for approval for the railway line section Biatorbagy (incl.)-Tata (excl.)
|
|
|
|
Studies for preparation of approval of the railway line section Budapest-Keleti-Miskolc-Nyiregyhaza
|
|
|
|
Lyon-Turin railway project: French accesses to the Base Tunnel
|
|
|
|
High Speed Line Bretagne "Pays de la Loire"
|
|
|
|
Works for high speed line Rhine-Rhône - Eastern section
|
|
|
|
New railway high speed line "LGV Est"
Second phase: section Baudrecourt-Vendenheim
|
|
|
|
High Speed Railway Line Paris-Madrid: Bordeaux-Spanish border
|
|
|
|
High speed railway line Paris-Madrid: Elimination of rail bottlenecks around Bordeaux
|
|
|
|
High speed railway line between Nîmes and Perpignan, works and studies for bypassing Nîmes and Montpellier
|
|
|
|
Railway Seinäjoki - Oulu (2007-2009)
|
|
|
|
Works for the development of the railway connection between Helsinki airport and the PP12 lines
|
|
|
|
Main railway connection to Russian border, works for development of railway section between Lahti and Vainikkala
|
|
|
|
Rail connection from Kouvola to Kotka/Hamina ports, works for improving and construction of a new railway yard
|
|
|
|
Development of the Railway Common Interface and Reference File Database Software in support of the TAF-TSI
|
|
|
|
High speed railway line Paris-Madrid: Section Abadiño-Durango
|
|
|
|
ERTMS on-board equipment of Thalys locomotives
|
|
|
|
Programme Management Office for the ERTMS deployment on the corridor Rotterdam-Genoa
|
|
|
|
Deployment of ERTMS on the corridor Antwerp-Basel/Lyon
|
|
|
|
ERTMS Implementation on the Railway Corridor D (Valencia-Budapest)
|
|
|
|
EEIG: ERTMS Users Group - testing activities
|
|
|
|
|
|
Studies for the development of the Railway Priority Project 22
|
|
|
|
Studies and Works in the High-Speed Rail Interoperability in Iberian Peninsula (PP19) - Oporto-Vigo Axis: Cross-Border Section Ponte de Lima-Vigo
|
|
|
|
Freight Railway Axis Sines-Madrid-Paris: New high capacity line through the Pyrenees
|
|
|
|
Cross-border railway line Trieste/Divača: study and design of the Trieste-Divača-Ljubljana-Budapest-Ukrainian border
|
|
|
|
New Lyon-Turin Rail Link Franco-Italian Common Part of the International Section (Studies and Works)
|
|
|
|
Works for construction of a high speed railway section between Perpignan and Figueras
|
|
|
|
Studies and works for the high speed railway axis of southwest Europe (PP3) - Lisbon-Madrid Axis: Cross-Border Section Evora-Merida
|
|
|
|
High speed railway line Paris-Madrid: Section Vitoria-Dax
|
|
|
|
Priority Project TEN no. 1 Brenner Base Tunnel Studies
|
|
|
|
Priority Project TEN no. 1
Brenner Base Tunnel Works
|
|
|
|
Works for the construction of the high speed line between Madrid-Barcelona-French border (Platform Works)
|
|
|
|
High speed railway line Paris-Madrid: Section Arrazua/Ubarrundia Mondragón
|
|
|
|
High speed railway line Paris-Madrid: Valladolid-Burgos-Vitoria
|
|
|
|
High speed railway line Paris-Madrid: Valladolid-Burgos
|
|
|
|
High speed railway line Paris-Madrid: New Railway Network Guipúzcoano
|
|
|
|
Studies for standardisation and upgrading design for the existing Patras-Pyrgos-Kalamata railway
|
|
|
|
Railway line between Antirrio and Ioannina, studies for designing of the new line Antirrio-Ioannina
|
|
|
|
Cross-border section Tartu-Valga railway reconstruction / upgrading
|
|
|
|
Studies for a European gauge line for Rail Baltica (Estonian section)
|
|
|
|
Studies for upgrading the railway access lines to the future Fehmarn Belt fixed link - from Ringsted to Rødby and the intersection in Kastrup
|
|
|
|
Studies for the capacity improvements of the section between Copenhagen and Ringsted
|
|
|
|
Equipment of the Railion Deutschland AG locomotives
|
|
|
|
Equipment with ETCS of the railway section Emmerich (border)-Oberhausen as part of the Corridor A Rotterdam-Genoa
|
|
|
|
ETCS Trackside equipment of the first part (Aachen-Oberausen) of the German part of the Corridor F Aachen-Warsaw / Belarus
|
|
|
|
Works for construction and re-construction of the partially existing railway section between Karlsruhe and Basel
|
|
|
|
Studies and works for the upgrading of the high speed railway line Duisburg-Emmerich
|
|
|
|
Studies for the construction of the high speed section between Frankfurt and Mannheim
|
|
|
|
Studies for linking to Fehmarn belt fixed link between Lübeck-Puttgarden
|
|
|
|
Works for construction and modernisation of the section between Kehl - Appenweier
|
|
|
|
Works for the construction of the high speed line between Stuttgart and Wendlingen
|
|
|
|
Works and studies for upgrading of the section München - Mühldorf - Freilassing, cross-border section DE / AT
|
|
|
|
Works for the construction of a high speed line between Wendlingen and Ulm
|
|
|
|
Works for the construction of the high speed rail line section between Saarbrücken and Ludwigshafen
|
|
|
|
|
|
Works for the construction of the section between Erfurt and Halle/Gröbers
|
|
|
|
Reconstruction of the Olomouc Railway Station
|
|
|
|
Reconstruction of the Railway Station Přerov
|
|
|
|
ERTMS deployment on Corridor E (Dresden-Budapest): On-board Equipment of Ceské dráhy, a.s.
|
|
|
|
Corridor E: Trackside equipment in the Czech Republic
|
|
|
|
Study for the upgrading of the railway line on the section Blazovice-Nezamyslice
|
|
|
|
Geotechnical and design studies for the construction of new rail connection Praha-Beroun
|
|
|
|
Technical assistance for restoration of design parameters along Ruse-Varna railway line
|
|
|
|
PBKAL: F/B border, Bruxelles-Liège-B/D border, Bruxelles B/NL border: Belgian part of the northern European high speed network
|
|
|
|
EuroCap-Rail on the Brussels-Luxembourg-Strasbourg railway axis
|
|
|
|
Diabolo: Rail link of the Zaventem airport to the Thalys high speed network
|
|
|
|
2007-AT-60450-P, ERTMS deployment on Corridor B (Stockholm-Naples) Austrian section
|
|
|
|
Works for the modernisation of the cross border section Salzburg German border
|
|
|
|
Works and studies for upgrading the Wien - Bratislava railway line
|
|
|
|
Works for construction of new high speed line between Kundl/Radfeld and Baumkirchen
|
|
|
|
Preparation of background document and feasibility study of the railway infrastructure development in the area of Ljubjana hub
|
|
|
|
Design for obtaining building permit for the reconstruction and electrification of the existing railway line Pragersko-Hodos
|
|
|
|
Detailed technical planning for ERTMS on Botniabanan
|
|
|
|
Preparation of modernisation and extension of Warsaw Railway Junction
|
|
|
|
Luxembourg station - north sector: Capacity and safety increase
|
|
|
|
Preparation of territorial planning documents and technical designs for Rail Baltica link from Lithuanian/Polish border to Kaunas
|
|
|
|
Study on the migration from the system SCMT to ETCS
|
|
|
|
Preparation of Detailed Design and Tender Documentation (Infrastructure and Signalling) for the Implementation Works of the Railways Line Szekesfehervar-Boba
|
|
|
|
Preparation of Design and Tender Documentation for Railways Station Szolnok, Detailed Design and Tender Documentation for Railways Line Debrecen-Záhony, Preparation activities for ETCS2 and for Sub-Stations for Szajol-Záhony Railways Line Section
|
|
|
|
Railway high speed line "LGV Est" section Vaires Baudrecourt Saarbrücken: Migration of ERTMS, corridor Paris-Frankfurt
|
|
|
|
TGV Sud: Nîmes-Montpellier-Perpignan section (preliminary studies) and terminal installations in the Perpignan-Figueras section
|
|
|
|
ERTMS development and consolidation
|
|
|
|
Infrastructure design of the connection of Kavala's freight port and the existing railway network with new single normal gauge railway line phase B
|
|
|
|
Suburban rail of Attica: Development studies
|
|
|
|
|
|
Studies for the Fehmarn belt Fixed Rail-Road Link
|
|
|
|
Studies for the Fehmarn belt Fixed Rail-Road Link
|
|
|
|
Railway link Paris-East-France-South-West-Germany, Upgrade of the Ludwigshafen-Saarbrücken section
|
|
|
|
New high-speed line between Karlsruhe and Basel, partly with reconstruction of the existing line
|
|
|
|
North-South high speed line Berlin-Palermo, Section between Nuremberg and Ebensfeld, Part Nuremberg-Fürth
|
|
|
|
North-South high speed line Berlin-Palermo, Nodal point Berlin: Main and Südkreuz railway Stations
|
|
|
|
Upgrade of Augsburg-Olching section for high speed railway traffic
|
|
|
|
Studies for the new construction of the Stuttgart-Ulm high speed line
|
|
|
|
Studies concerning the optimisation of the railway section between Mosty u Jablunkova at the Slovakian Border and Bystřice nad Olí
|
|
|
|
Studies concerning the construction of a new line on the railway section Ústí nad Olricí-Chocen and the passage through railway junction Ústí nad Olricí Preliminary design, territorial and technical study and detailed design
|
|
|
|
Studies concerning the modernisation of the railway track line Blazovice-Nezamyslice: preliminary design, EIA, geotechnical documentation
|
|
|
|
Upgrading of the railway track Púchov-ilina to a speed of 160 km/h
|
|
|
|
Studies on the railway interconnection of the TEN-T rail corridor with the airport and Bratislava rail network
|
|
|
|
ERTMS Test section for Botniabanan 2005-2007
|
|
|
|
Feasibility study and technical studies of the GSM-R system in TEN-T Rail network in Poland
|
|
|
|
Feasibility Studies on a Railway Information Service System for Passengers and Enterprise Customers SITKol
|
|
|
|
Feasibility Study of modernisation of railway line C-E 65 (Gdynia)-Tczew-Bydgoszcz-Inowrocław-Zduńska Wola-Karsznice- Tarnowskie Góry-Pszczyna
|
|
|
|
Type approval of the first locomotive equipped with ETCS
|
|
|
|
Modification of Rotterdam Central Station in connection with PBKAL project Amsterdam-Dutch/Belgian border
|
|
|
|
Integration of Riga City and Riga Port into the TEN-T network: Completion of studies for Riga Northern Transport Corridor
|
|
|
|
New AV/AC line Venezia-Trieste-(Lubiana) in Italian territory: sections project
|
|
|
|
Strenghtening of the Turin-Modane line and Turin freight belt
|
|
|
|
South Europe Atlantic high speed line - Angoulême-Bordeaux section- Studies
|
|
|
|
High speed line east Vaires-Baudrecourt section: new maintenance facility at Ourcq and new stations
|
|
|
|
New Lyon-Turin Rail Link International Section
|
|
|
|
WEST-EAST RAIL AXIS: Improvement of vertical links to third countries, nodes and links to industrial areas
|
|
|
|
Planning for the upgrading of the railway connection line NL/D border Emmerich-Oberhausen
|
|
|
|
Technical and economic study for the section: Modernisation of the Rokycany-Plzen railway line
|
|
|
|
Equipment of A Network with ETCS Level 1; Phase 1: Wien West Salzburg and Wels Passau
|
|
|
|
Technical documentation for the construction of the 2nd track of the railway line Divača-Koper
|
|
|
|
Modernisation of E59 railway line on section Poznań-Szczecin-Świnoujście
|
|
|
|
Modernisation of E30 railway line (III Corridor) on section Kraków-Medyka - state border
|
|
|
|
New AV/AC Venezia-Trieste-(Lubiana) line in italian territory: section project
|
|
|
|
Study on the rehabilitation of the railway line section Székesfehérvár-Boba
|
|
|
|
Study on the rehabilitation of the railway line section Szajol-Záhony
|
|
|
|
Nouvelle liaison ferroviaire transalpine Lyon-Turin, section internationale (partie sous maîtrise d'uvre RFF)
|
|
|
|
Optimisation of the Railway Section Břeclav - Czech/Slovak State Border
|
|
|
|
Prague-Linz-Maribor rail connection: technical, construction and alignment designs for the two tracks construction in section Werndorf South- Spielfeld (Sentilj)
|
|
|
|
ERTMS Botniabanan: Planning and detailed technical design of the signalling system compliant with the ERTMS standard for the Botniabanan line
|
|
|
|
Upgrade of the Turin-Modane line and the Turin freight bypass
|
|
|
|
Study and implementation of the migration of the DB ERTMS/ETCS pilot project for installation in the Munich-Ingolstadt-Nurnberg section
|
|
|
|
High Speed Railway Line Madrid-Barcelona-French border
|
|
|
|
New high speed line Leipzig-Dresden, Dresden hbf-Neustadt section
|
|
|