ERTMS (European Rail Traffic Management System)


ERTMS is a harmonised command and control system recommended for the European railway network. ERTMS and its related projects aim at ensuring continuity and interoperability, bringing users a high-level of security and safety.  

 

Due to the importance of ERTMS/rail transport in the European transport policy, a European Coordinator, Karel Vinck was appointed to this area in July 2005.

 

Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.


 2011-PL-60002-P

Development of ERTMS/ETCS Level 1 system on the E20/CE20 line, at the Kunowice-Warsaw section


 2011-PL-60001-P

Retrofitting of 9 ES64U4 "Husarz" (EU44) locomotives with ETCS SRS 3.x.0 and line tests on the railway infrastructure equipped with ETCS Level 1 and 2 SRS 2.3.0 in Poland, Czech Republic and Austria


 2011-NL-60003-P

Prototyping, testing, renewed authorisation for placing in service and the retrofit of Siemens ES64U2 locomotives with ETCS L1/L2 2.3.0.d for Corridor A, B and E networks in DE, AT, HU and CH


 2011-NL-60001-P

Implementation and testing of the interface between the German Baseline 3 system and the Dutch 230d ERTMS systems


 2011-IT-60002-P

Upgrading of ERTMS system on Trenitalia fleet to 2.3.0.d version


 2011-IT-60001-P

Deployment of ERTMS trackside equipment on the Railway Corridor B Stockholm-Naples/Subpart Fortezza to Verona of the Italian Corridor B part (Brennero-Verona-Naples)


 2011-FR-60004-P

Prototyping, testing, certifying and retrofitting of Alstom Prima locomotives for usage on the TEN T corridors


 2011-EU-60013-S

Facilitating and speeding up ERTMS deployment


 2011-EU-60009-S

Simulation Environment for Fast ERTMS Validation


 2011-EU-60008-S

Study and implementation of major parts of the Corridor Freight Regulation 913/2010


 2011-EU-60006-P

ERTMS upgrade to ETCS Baseline 2 (version 2.3.0d) for the Perpignan-Figueras high speed line


 2011-EU-60005-S

Preparatory studies for the implementation of additional measures on ERTMS Corridor Rotterdam-Genoa and ERTMS Corridor Antwerp-Basel-Lyon


 2011-ES-60002-P

ERTMS Deployment on the Madrid-Castilla la Mancha-Comunidad Valenciana-Murcia high speed line. Albacete-Alicante section


 2011-ES-60001-P

Upgrade of Spanish HS Lines and Trains to ERTMS 2.3.0.d


 2011-DE-60004-P

Hochrustung der Strecke Berlin - Halle/Leipzig (VDE 8.3) von ETCS Level 2 (SRS 2.2.2+) auf ETCS Level 2 (SRS 2.3.0d)


 2010-EU-92240-S

Studies on improving the Freight Corridor Concept by using Telematic Applications for Freight, and methods, tools and procedures developed by RNE for rail corridors


 2009-SK-60108-P

ETCS deployment on Corridor VI:Zilina-Cadca-State Border SK/CZ


 2009-SE-60144-P

Deployment of ERTMS in Sweden


 2009-PT-60152-P

Implementation of the European Rail Traffic Management System on the high speed stretch between Lisbon and Caia, an integral part of the Lisbon-Madrid


 2009-PL-60151-P

Project and development of ETCS level 1 system at the section of the E65,CMK, railway line, Grodzisk Mazowiecki-Zawiercie


 2009-NL-60142-P

Retrofitting of ETCS onboard equipment for locomotives to run in ERTMS Corridor A


 2009-NL-60128-P

Fitting of ETCS onboard equipment to Traxx DABNLs


 2009-NL-60124-P

ERTMS upgrade of existing locomotives to ensure compatibility with SRS 2.3.0d for use in the Betuwe line


 2009-NL-60123-P

Upgrade of ETCS system to 2.3.0d in the Betuwe Route


 2009-IT-60149-P

Deployment of ERTMS trackside equipment on the Railway Corridor B Stockholm-Naples: Sub-part from Brenner to Verona of the Italian Corridor B part (Brenner-Naples)


 2009-IT-60102-P

Upgrade of Roma-Napoli and Torino-Novara high speed lines in order to ensure compatibility with ERTMS version 2.3.0d


 2009-HU-60139-P

Retrofitting of MÁV-TRAKCIÓ locomotives with ETCS equipment to be operated on “Corridor E”


 2009-FR-60132-P

Migration of the French East European high speed line to Specification Baseline 2.3.0.d


 2009-EU-60146-S

Programme management office for the ERTMS deployment on the corridor from Rotterdam to Genoa


 2009-EU-60138-P

Retrofitment of locomotives with onboard ETCS equipment


 2009-EU-60126-S

Support to the ERTMS Consolidation


 2009-EU-60122-P

Deployment of ERTMS on Corridor D: Valencia to Budapest


 2009-EU-60106-P

ERTMS implementation on the Railway Corridor C (Antwerpen-Lyon/Basel)


 2009-DE-60120-P

Equipment of freight locomotives with ETCS on-board-units according to SRS 2.3.0.d


 2009-CZ-60145-P

Rail Corridor E ERTMS/ETCS in the section of German border-Decín-Prague-Kolín


 2009-AT-60153-P

ERTMS deployment on Corridor B (Stockholm-Naples) Austrian vehicles


 2009-AT-60148-P

ERTMS deployment on Corridor E (Dresden-Constanta) Trackside equipment


 2009-AT-60147-P

ERTMS deployment on Corridor E (Dresden-Constanta) Austrian vehicles


 2008-LU-91700-P

Deployment of ETCS Level 1 on Luxembourg railway network


 2008-EU-91901-S

NETLIPSE


 2008-EU-90000-S

Feasibility study on international rail real time traffic monitoring and electronic path request systems


 2007-SI-60460-S

Implementation of the GSM-R system in Slovenian railway network


 2007-NL-60380-P

Retrofit of 90 Siemens ES64F4 E-locomotives with Alstom ETCS L2 equipment for usage on EU freight corridors and various conventional networks


 2007-NL-60310-P

ERTMS implementation the Railway Corridor Rotterdam-Genoa- Netherlands part - Section Port Railway of Rotterdam


 2007-NL-60160-P

Serial fitment of onboard ETCS equipment SRS 2.3.0 in 109 freight locomotives


 2007-NL-60060-P

ERTMS implementation on the railway corridor Rotterdam-Genoa-Netherlands Part - Kijfhoek & Zevenaar


 2007-IT-60360-P

Trackside ERTMS equipment on Italian part of Corridor A (600 km)


 2007-IT-60030-P

Migration towards ERTMS/ETCS for Trenitalia on-board equipment


 2007-EU-60440-P

ERTMS on-board equipment of Thalys locomotives


 2007-EU-60410-S

Programme Management Office for the ERTMS deployment on the corridor Rotterdam-Genoa


 2007-EU-60400-P

Deployment of ERTMS on the corridor Antwerp-Basel/Lyon


 2007-EU-60120-P

ERTMS Implementation on the Railway Corridor D (Valencia-Budapest)


 2007-EU-60040-P

EEIG: ERTMS Users Group - testing activities


 2007-DE-60490-P

Equipment of the Railion Deutschland AG locomotives


 2007-DE-60320-P

Equipment with ETCS of the railway section Emmerich (border)-Oberhausen as part of the Corridor A Rotterdam-Genoa


 2007-DE-60080-P

ETCS Trackside equipment of the first part (Aachen-Oberausen) of the German part of the Corridor F Aachen-Warsaw / Belarus


 2007-CZ-60020-P

ERTMS deployment on Corridor E (Dresden-Budapest): On-board Equipment of Ceské dráhy, a.s.


 2007-CZ-60010-P

Corridor E: Trackside equipment in the Czech Republic


 2007-AT-60450-P

2007-AT-60450-P, ERTMS deployment on Corridor B (Stockholm-Naples) – Austrian section


 2006-SE-91401-S

Detailed technical planning for ERTMS on Botniabanan


 2006-IT-90906-S

Study on the migration from the system SCMT to ETCS


 2006-IT-90903-P

ERTMS installation on the high speed section Bologna-Firenze


 2006-FR-401c-S, ERTMS Corridor C

Railway high speed line "LGV Est" section Vaires – Baudrecourt – Saarbrücken: Migration of ERTMS, corridor Paris-Frankfurt


 2006-EU-93001-S

ERTMS development and consolidation


 2006-DE-PP402b

ETCS Pilot POS Nord


 2005-SE-91401-S

ERTMS Test section for Botniabanan 2005-2007


 2005-PL-92606-S

Feasibility study and technical studies of the GSM-R system in TEN-T Rail network in Poland


 2005-NL-91102-S

Type approval of the first locomotive equipped with ETCS


 2005-AT-90103-P

Equipment of A Network with ETCS Level 1; Phase 1: Wien West – Salzburg and Wels Passau


 2003-SE-1402-S

ERTMS Botniabanan: Planning and detailed technical design of the signalling system compliant with the ERTMS standard for the Botniabanan line


 2003-DE-306-S

Study and implementation of the migration of the DB ERTMS/ETCS pilot project for installation in the Munich-Ingolstadt-Nurnberg section



(Mailing address)
TEN-T Executive Agency
European Commission
W910
B-1049 Brussels
(Visiting address)
Chaussée de Wavre 910
B-1040 Brussels
Belgium