Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
|
Southampton Port to West Coast Main Line: rail freight upgrade and hinterland connections
|
|
|
|
Studies for intermodal transport infrastructure development for passenger & freight at Cluj-Napoca International Airport
|
|
|
|
Realisation of the most sustainable container terminal in Europe which will increase intermodal transport between the Port of Rotterdam and the European Hinterland
|
|
|
|
Preliminary studies for the development of four multimodal platforms Canal Seine-Nord Europe & their road and rail connections
|
|
|
|
Study for the creation of the intermodal platform Seine-Metropole Port on the Seine River
|
|
|
|
Consolidation and strengthening of the corridor Upper Rhine as a central hub for the TEN-T network
|
|
|
|
Sea2Sea: Developing a multimodal freight corridor to connect the Aegean to the Black Sea
|
|
|
|
Liège Carex: studies for railport construction at Liège Airport
|
|
|
|
|
|
Freight Terminal Wolfurt Planning
|
|
|
|
|
|
Felixstowe Rail Terminal - Improving intermodal transfer and removing bottleneck on PP26
|
|
|
|
Preparation of detailed design for Valencia-Fuente de San Luis and Madrid-Vicálvaro railway freight terminals
|
|
|
|
Muelle Prat rail terminal
|
|
|
|
Terminal Wien Inzersdorf Planing, (PP 17 Section: Vienna-Salzburg)
|
|
|
|
Intermodal Terminal Wörgl (TEN-T Priority Project 1 - Section Kufstein-Innsbruck)
|
|
|
|
Study for Bergamo-Orio al serio airport development intermodality
|
|
|
|
Baltic Transport Outlook 2030
|
|
|
|
Intermodal logistics platform Vilamalla/el Far d'Empordà: previous studies and projects for the establishment of an intermodal logistics platform to the south of the Spanish-French border
|
|
|
|
Feasibility study and preliminary design of an integrated multimodal transport system
|
|
|
|
Feasibility study of Marco Polo Venice International Airport Intermodality Node
|
|
|
|
|
|
Study on the external costs and charging of the terrestrial modes on the Paris-Amsterdam corridor
|
|
|
|
Establishment of infrastructure facilities at Norra Hamnen in Malmö for modal shift between sea, rail and road
|
|
|
|
Integrated railway transport system: the Port of Genova and the hinterland railway terminal of Alessandria
|
|
|
|
Studies for standardisation and upgrading design for the existing Patras-Pyrgos-Kalamata railway
|
|
|
|
Railway line between Antirrio and Ioannina, studies for designing of the new line Antirrio-Ioannina
|
|
|
|
The Marselis Tunnel Project - Aarhus, Denmark
|
|
|
|
Technical assistance for construction of intermodal terminal in Central-South Planning Development Region in Bulgaria - Plovdiv
|
|
|
|
Technical assistance for construction of intermodal terminal in Central-North Planning Development Region in Bulgaria - Ruse
|
|
|
|
Improvement of rail connections and facilities for the Port of Göteborg
|
|
|