Implementation and testing of the interface between the German Baseline 3 system and the Dutch 2.3.0.d ERTMS systems |
|
|
 |
|
The installation of the ERTMS along the freight corridor A Rotterdam-Genoa is a major project aiming to facilitate and increase the freight traffic betweenRotterdamport and the EU Central and Southern Member States.
This Action aims to enhance the interoperability on the Dutch-German cross-border section Zevenaar-Emmerich by implementing and testing the interface between the Dutch trackside system (equipped with ETCS Level 2, SRS 2.3.0d) and the German one, which is going to be equipped with ETCS Level 2, Baseline 3.
The Action includes the following activities:
- Realisation of the ERTMS 2.3.0d – Baseline 3 interface
- Testing of the ERTMS 2.3.0d – Baseline 3 interface
|
Budget:
National budget:
€2,050,000
|
Total project cost covered by this Decision:
€4,100,000
|
Percentage of EU support:
Works: 50%
|
|
EU contribution:
€2,050,000
|
Download the Info Sheet about this project:
.pdf (356 KB)
This project was also the subject of a press release issued by the Agency.
|
Please note that the present page is for information purposes only. Only the content of the individual Commission Decision (under preparation) can be considered legally binding.
|
|
 |
 |
| Click map to view enlarged version |
Member States involved:
The Netherlands
Implementation schedule:
Start date: January 2011
End date: December 2014
Beneficiary & Implementiung body:
ProRail BV
Additional information:
Coordinator’s Report of the Priority Project
European Commission, DG MOVE
|
|
|
|
|
|
 |
|
|
|
 |
(Mailing address) TEN-T Executive Agency European Commission W910 B-1049 Brussels |
 |
(Visiting address) Chaussée de Wavre 910 B-1040 Brussels Belgium |
 |
 |
 |
|
 |
|
 |
|