Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
|
Stockholm Bypass, tunnel safety studies
|
|
|
|
Upgrading of maritime infrastructure in Lake Malaren
|
|
|
|
Western link - railway tunnel in Gothenburg
|
|
|
|
Bothnian Corridor -East Coast Line - increased capacity meeting stations
|
|
|
|
Bothnian Corridor - East Coast Line - increased capacity. Study new line Stangan-Dingersjo
|
|
|
|
|
|
Air traffic management network integration and performance enhancement acceleration
|
|
|
|
ANSPs coordination within IDSG
|
|
|
|
|
|
|
|
Facilitating and speeding up ERTMS deployment
|
|
|
|
Green Bridge on Nordic Corridor
|
|
|
|
|
|
|
|
On Shore Power Supply - an integrated North Sea network
|
|
|
|
Completion of the Haparanda Line - an important link in the Bothnian Corridor
|
|
|
|
|
|
The Baltic Sea Hub and Spokes Project
|
|
|
|
Nordic Triangle-Malmö C-completion works
|
|
|
|
|
|
Deployment of ERTMS in Sweden
|
|
|
|
E6.21 Partihall Connection
|
|
|
|
Port infrastructure facilities in the Malmö Northerm Harbour
|
|
|
|
Baltic Transport Outlook 2030
|
|
|
|
Support to the ERTMS Consolidation
|
|
|
|
|
|
Airborne Datalink Equipment
|
|
|
|
Green and predictable Flights North European Air Navigation Service Providers
|
|
|
|
Baltic Link Gdyńia-Karlskrona
|
|
|
|
Works for the upgrading of the Road E6 Trelleborg-Vellinge
|
|
|
|
Norrköping intermodal infrastructure package- improvement of access fairway
|
|
|
|
Nordic Triangle - Reconstruction of Malmö Central
|
|
|
|
Nordic Triangle: Götaland Line - (Borås-Jönköping-Linköping) - High Speed Line
|
|
|
|
Norrköping Intermodal Infrastructure Package Road Bypass Norrköping, Study
|
|
|
|
|
|
North European ATM Service Concepts - Feasibility study for a North European Functional Airspace Block
|
|
|
|
Motorways of the Sea projects in the Baltic Sea Area Klaipéda-Karlshamn link
|
|
|
|
High Quality Rail and Intermodal Nordic Corridor Königslinie
|
|
|
|
|
|
Establishment of infrastructure facilities at Norra Hamnen in Malmö for modal shift between sea, rail and road
|
|
|
|
|
|
Nordic Triangle: Ostlanken (Jarna-Linköping)
|
|
|
|
Works for construction of City tunnel project
|
|
|
|
Works for construction of the road section Norra Lanken
|
|
|
|
Development of the Railway Common Interface and Reference File Database Software in support of the TAF-TSI
|
|
|
|
EEIG: ERTMS Users Group - testing activities
|
|
|
|
|
|
SESAR (Single European Sky ATM Research) Development Phase
|
|
|
|
Trans-European Satellite Navigation System (Galileo): Development and validation phase
|
|
|
|
Improvement of rail connections and facilities for the Port of Göteborg
|
|
|
|
Detailed technical planning for ERTMS on Botniabanan
|
|
|
|
Master Plan Studies for Development of the Baltic Sea Information Motorways (BASIS)
|
|
|
|
ERTMS development and consolidation
|
|
|
|
ERTMS Test section for Botniabanan 2005-2007
|
|
|
|
The definition, organisation and establishment of a single Nordic Functional Upper Airspace Block, serviced by a single Nordic Air Traffic Management Area Control Centre - NUAC
|
|
|
|
ERTMS Botniabanan: Planning and detailed technical design of the signalling system compliant with the ERTMS standard for the Botniabanan line
|
|
|