This project, part of Priority Project 25 (Motorway axisGdansk–Brno/Bratislava-Vienna), involves preparatory and design studies for the motorway D3, section Svrèinovec-Skalité. The 12,2 long section is part of the missing link that will connect Bratislava with Poland and Czech Republic, facilitating cross border traffic and eliminating several bottlenecks. The design of two tunnels (Svrèinovec, Po¾ana) is also included in the project.
The project encompasses the following activities:
- Preparation of documentation for building permission;
- Drafting of tender documentation;
- Drafting of engineering-geological survey;
- Carrying out of exploratory excavation.
This project has been completed.
|
Budget:
National budget:
€3,930,000
|
Total project cost covered by this Decision:
€7,730,000
|
Percentage of EU support:
Studies: 49.16%
|
|
EU contribution:
€3,800,000
|
Download the Info Sheet about this project:
.pdf (542.2 KB)
|
 |
 |
| Click map to view enlarged version |
Member States involved:
Slovakia
Implementation schedule:
Start date: March 2005
End date: December 2008
Beneficiary:
Ministry of Transport, Posts and Telecommunications
Implementing body:
National Motorway Company
Additional information:
European Commission, DG MOVE
|