Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
|
Preparations to develop Public-Private Partnership (DBFM) during realisation of the Beatrix locks and the Lekkanaal (Amsterdam-Rotterdam-Antwerp corridor)
|
|
|
|
Implementation study eliminating the major bottlenecks in the Amsterdam-Rotterdam-Antwerp corridor
|
|
|
|
Elimination bottleneck north-south artery A2(E25): Providing safety measures in the urban highway tunnel in Maastricht
|
|
|
|
Freight corridor Betuweroute-southeast Netherlands-Germany (Corridor I)
|
|
|
|
Realisation of the most sustainable container terminal in Europe which will increase intermodal transport between the Port of Rotterdam and the European Hinterland
|
|
|
|
Prototyping, testing, renewed authorisation for placing in service and the retrofit of Siemens ES64U2 locomotives with ETCS L1/L2 2.3.0.d for Corridor A, B and E networks in DE, AT, HU and CH
|
|
|
|
Implementation and testing of the interface between the German Baseline 3 system and the Dutch 230d ERTMS systems
|
|
|
|
Preparatory studies and activities of the RFC8 organisational structures Bremerhaven/Rotterdam/Antwerp-Aachen/Berlin-Warsaw-Terespol (Poland-Belarus border)/Kaunas for the corridor to become operational by 10 November 2015
|
|
|
|
Studies, managerial structures and activities for the establishment of Rail Freight Corridor 2
|
|
|
|
Air traffic management network integration and performance enhancement acceleration
|
|
|
|
Planning study for a new maritime lock in Terneuzen
|
|
|
|
|
|
Implementation of RIS on the Westerscheldt River II
|
|
|
|
Vessel Traffic Management Centres of the Future
|
|
|
|
Study and implementation of major parts of the Corridor Freight Regulation 913/2010
|
|
|
|
Implementation Study to prepare a Public-Private Partnership to improve maritime access to the TEN-T network at Amsterdam
|
|
|
|
Studies concerning the extension railway yard Maasvlakte West- Phase 1
|
|
|
|
Studies concerning the construction of the third Track Zevenaar-German border
|
|
|
|
Greening European Transportation Infrastructure for Electric Vehicles
|
|
|
|
Deployment of Inland AIS transponders in Flanders and the Netherlands
|
|
|
|
Air Traffic Management Systems - Functional Airspace Block Europe Central (FABEC)
|
|
|
|
Retrofitting of ETCS onboard equipment for locomotives to run in ERTMS Corridor A
|
|
|
|
Fitting of ETCS onboard equipment to Traxx DABNLs
|
|
|
|
ERTMS upgrade of existing locomotives to ensure compatibility with SRS 2.3.0d for use in the Betuwe line
|
|
|
|
Upgrade of ETCS system to 2.3.0d in the Betuwe Route
|
|
|
|
Optimising rail connection Port of Amsterdam-European Hinterland (ORCAEU) - Elimination of missing links for intermodal freight transport
|
|
|
|
Elimination bottleneck north-south artery A2 (E25): Building the urban highway tunnel in Maastricht
|
|
|
|
Programme management office for the ERTMS deployment on the corridor from Rotterdam to Genoa
|
|
|
|
Retrofitment of locomotives with onboard ETCS equipment
|
|
|
|
Support to the ERTMS Consolidation
|
|
|
|
|
|
Airborne Datalink Equipment
|
|
|
|
Study and implementation of AIS monitoring network
|
|
|
|
Implementation of Fairway Information Services
|
|
|
|
|
|
Study on the external costs and charging of the terrestrial modes on the Paris-Amsterdam corridor
|
|
|
|
Implementation of River Information Services in Europe - IRIS Europe II
|
|
|
|
Implementation of RIS on the
Westerscheldt river
|
|
|
|
Retrofit of 90 Siemens ES64F4 E-locomotives with Alstom ETCS L2 equipment for usage on EU freight corridors and various conventional networks
|
|
|
|
ERTMS implementation the Railway Corridor Rotterdam-Genoa- Netherlands part - Section Port Railway of Rotterdam
|
|
|
|
Serial fitment of onboard ETCS equipment SRS 2.3.0 in 109 freight locomotives
|
|
|
|
ERTMS implementation on the railway corridor Rotterdam-Genoa-Netherlands Part - Kijfhoek & Zevenaar
|
|
|
|
Maasroute, Upgrade of inland waterways from class Va to class Vb specifications
|
|
|
|
Works for replacement of legacy systems by 15/25 kVAC on two remaining sections in the Netherlands of the railway corridor Rotterdam-Genoa
|
|
|
|
ERTMS on-board equipment of Thalys locomotives
|
|
|
|
Programme Management Office for the ERTMS deployment on the corridor Rotterdam-Genoa
|
|
|
|
EEIG: ERTMS Users Group - testing activities
|
|
|
|
|
|
SESAR (Single European Sky ATM Research) Development Phase
|
|
|
|
|
|
Trans-European Satellite Navigation System (Galileo): Development and validation phase
|
|
|
|
ERTMS development and consolidation
|
|
|
|
Type approval of the first locomotive equipped with ETCS
|
|
|
|
Modification of Rotterdam Central Station in connection with PBKAL project Amsterdam-Dutch/Belgian border
|
|
|