Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
|
|
|
Implementation study to prepare a PPP to improve the capacity of the port of Venice and related logistics system
|
|
|
|
Bologna AV/AC rail node: construction of a rail section between the node and the Venice line to streamline traffic
|
|
|
|
Turin-Padua: technological improvements to the efficiency of the Milan railway junction
|
|
|
|
Genoa rail node: improvement of the traffic management systems
|
|
|
|
Treviglio-Brescia HS/HC section: civil works phase
|
|
|
|
Upgrading of ERTMS system on Trenitalia fleet to 2.3.0.d version
|
|
|
|
Deployment of ERTMS trackside equipment on the Railway Corridor B Stockholm-Naples/Subpart Fortezza to Verona of the Italian Corridor B part (Brennero-Verona-Naples)
|
|
|
|
Studies, managerial structures and activities for the establishment of the Rail Freight Corridor 6 in line with Regulation (EU) No 913/2010.
|
|
|
|
Preparatory studies and activities of the RFC8 organisational structures Bremerhaven/Rotterdam/Antwerp-Aachen/Berlin-Warsaw-Terespol (Poland-Belarus border)/Kaunas for the corridor to become operational by 10 November 2015
|
|
|
|
Air traffic management network integration and performance enhancement acceleration
|
|
|
|
ANSPs coordination within IDSG
|
|
|
|
Green technologies and eco-efficient alternatives for cranes & operations at port container terminals (GREENCRANES)
|
|
|
|
Facilitating and speeding up ERTMS deployment
|
|
|
|
Study and implementation of major parts of the Corridor Freight Regulation 913/2010
|
|
|
|
|
|
|
|
Adriatic Motorways of the Sea (ADRIAMOS)
|
|
|
|
ADRIATIC GATEWAY: the improvement of northern Adriatic ports and the building of a strategic corridor for multimodal transport
|
|
|
|
Intermodal hub project for Catania Fontanarossa International Airport
|
|
|
|
|
|
Studies for the Development of the RIS Operability along the Northern Italy Waterway System
|
|
|
|
ITS Adriatic multi-port gateway
|
|
|
|
|
|
Monitoring and Operation Services for Motorways of the Sea (MOS4MOS)
|
|
|
|
MoS 24 - ICT based Co-modality Promotion Center for integrating PP24 into Mediterranean MoS
|
|
|
|
Upgrading the S.Pellegrino Tunnel (SS n.675 Umbro-Laziale) and the Colle Capretto Tunnel (SS n.3bis Tiberina) on the E45 to the safety requirements for tunnels in the Trans-European Road Network
|
|
|
|
Study for Bergamo-Orio al serio airport development intermodality
|
|
|
|
Strategic project for the development of the accessibility and hinterland connections from the port of Venice to the TEN-T network
|
|
|
|
Studies for the infrastructural improvement of Northern Italy Waterway System
|
|
|
|
Upgrade of the Tortona-Voghera section, Priority Project 24, Final Design
|
|
|
|
Deployment of ERTMS trackside equipment on the Railway Corridor B Stockholm-Naples: Sub-part from Brenner to Verona of the Italian Corridor B part (Brenner-Naples)
|
|
|
|
Upgrade of Roma-Napoli and Torino-Novara high speed lines in order to ensure compatibility with ERTMS version 2.3.0d
|
|
|
|
Italy Integration of Communication and Surveillance IP1
|
|
|
|
Hub of Torino, section Susa-Stura, Priority Project 6, removal of bottleneck
|
|
|
|
Rome Hub, Priority Project no. 1 - upgrade of Rome Tiburtina Station
|
|
|
|
Implementation of nautical accessibility in the port of Venice-Marghera: operational and remedial dredging in two stretches of the west and south ship canals
|
|
|
|
Infrastructural improvements in the inland waterways system of Northern Italy
|
|
|
|
Rome Ring Road Motorway northwestern section upgrade to three lanes in both directions from km 11+250 to km 12+650 completion works
|
|
|
|
Programme management office for the ERTMS deployment on the corridor from Rotterdam to Genoa
|
|
|
|
Support to the ERTMS Consolidation
|
|
|
|
Deployment of ERTMS on Corridor D: Valencia to Budapest
|
|
|
|
|
|
Airborne Datalink Equipment
|
|
|
|
Feasibility study and preliminary design of an integrated multimodal transport system
|
|
|
|
Feasibility study of Marco Polo Venice International Airport Intermodality Node
|
|
|
|
Functional adaptation of both road and rail networks in the stretch Malcontenta-Fusina of "via dell'Elettronica" in the port of Marghera - Venice
|
|
|
|
Completion of final design of the Treviglio-Brescia Section, on the Milano-Verona high speed/high capacity line
|
|
|
|
Removal of the bottleneck of Cattolica tunnel to allow the transit of high-cube container trains along the Adriatic Corridor
|
|
|
|
Upgrading the Montecrevola Road Tunnel on the SS
n. 33 del Sempione E62 to the safety requirements for tunnels in the Trans-European Road Network
|
|
|
|
|
|
BLUE MED Definition Phase
|
|
|
|
Integrated railway transport system: the Port of Genova and the hinterland railway terminal of Alessandria
|
|
|
|
Preliminary and detailed design for the rehabilitation of a railway link between Civitavecchia Port and TEN-T Priority Axis no. 1 in Orte
|
|
|
|
Strengthening and restructuring of the railway
facilities and network in the Marghera area
Completion of the project
|
|
|
|
Cargo City Development Railway Tunnel
|
|
|
|
Trackside ERTMS equipment on Italian part of Corridor A (600 km)
|
|
|
|
Migration towards ERTMS/ETCS for Trenitalia on-board equipment
|
|
|
|
Railway node of Genova - Study for upgrading
the section Genova Voltri-Genova Brignole
|
|
|
|
Section Ronchi Sud-Trieste: Priority Project 6 national section
|
|
|
|
Southern Access line to Brenner
|
|
|
|
Programme Management Office for the ERTMS deployment on the corridor Rotterdam-Genoa
|
|
|
|
ERTMS Implementation on the Railway Corridor D (Valencia-Budapest)
|
|
|
|
EEIG: ERTMS Users Group - testing activities
|
|
|
|
|
|
SESAR (Single European Sky ATM Research) Development Phase
|
|
|
|
Trans-European Satellite Navigation System (Galileo): Development and validation phase
|
|
|
|
Cross-border railway line Trieste/Divača: study and design of the Trieste-Divača-Ljubljana-Budapest-Ukrainian border
|
|
|
|
New Lyon-Turin Rail Link Franco-Italian Common Part of the International Section (Studies and Works)
|
|
|
|
Priority Project TEN no. 1 Brenner Base Tunnel Studies
|
|
|
|
Priority Project TEN no. 1
Brenner Base Tunnel Works
|
|
|
|
Study on the migration from the system SCMT to ETCS
|
|
|
|
ERTMS installation on the high speed section Bologna-Firenze
|
|
|
|
|
|
ERTMS development and consolidation
|
|
|
|
New AV/AC line Venezia-Trieste-(Lubiana) in Italian territory: sections project
|
|
|
|
Strenghtening of the Turin-Modane line and Turin freight belt
|
|
|
|
New Lyon-Turin Rail Link International Section
|
|
|
|
New AV/AC Venezia-Trieste-(Lubiana) line in italian territory: section project
|
|
|
|
Upgrade of the Turin-Modane line and the Turin freight bypass
|
|
|