Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
|
Sea2Sea: Developing a multimodal freight corridor to connect the Aegean to the Black Sea
|
|
|
|
Air traffic management network integration and performance enhancement acceleration
|
|
|
|
|
|
|
|
Adriatic Motorways of the Sea (ADRIAMOS)
|
|
|
|
Remaining studies to complete the upgrading of the main rail axis Athens-Thessaloniki in the section ATHENS R.S. (KM 9+700 ) - AHARNES ATTICA (KM 22+300)
|
|
|
|
Monitoring and Operation Services for Motorways of the Sea (MOS4MOS)
|
|
|
|
Completion of the study Ionian Highway (Western Axis) from the end of concession to Kakavia
|
|
|
|
|
|
Airborne Datalink Equipment
|
|
|
|
|
|
BLUE MED Definition Phase
|
|
|
|
Designs for the upgrading-completion of the Serres-Kavala axis (Phase A: Completion of 1st section Serres ring road)
|
|
|
|
Designs for the connection of Egnatia/Pathe highways (PP 07) with Macedonia Airport of Thessaloniki (Phase B)
|
|
|
|
|
|
SESAR (Single European Sky ATM Research) Development Phase
|
|
|
|
Studies for the development of the Railway Priority Project 22
|
|
|
|
Trans-European Satellite Navigation System (Galileo): Development and validation phase
|
|
|
|
Ionian Highway (Western Axis) from the end of concession to Kakavia
|
|
|
|
Studies for standardisation and upgrading design for the existing Patras-Pyrgos-Kalamata railway
|
|
|
|
Railway line between Antirrio and Ioannina, studies for designing of the new line Antirrio-Ioannina
|
|
|
|
Studies for the development of the motorway project of PP7 (Igoumenitsa/Patras-Athens-Sofia-Budapest Motorway Axis)
|
|
|
|
Studies for the vertical access Thessaloniki-Serres-Promachonas
|
|
|
|
ERTMS development and consolidation
|
|
|
|
Completion updating of studies, supplementary studies for the conversion of the national road Athens-Korinthos (section Daphni-O.J. section with old national road Elefsina-Thiva (ONRET)) to a motorway (phase A)
|
|
|
|
Infrastructure design of the connection of Kavala's freight port and the existing railway network with new single normal gauge railway line phase B
|
|
|
|
Suburban rail of Attica: Development studies
|
|
|
|
WEST-EAST RAIL AXIS: Improvement of vertical links to third countries, nodes and links to industrial areas
|
|
|