2007-DE-60080-P


ETCS Trackside equipment of the first part (Aachen-Oberausen) of the German part of the Corridor F Aachen-Warsaw/Belarus

ERTMS Corridor F


European Rail Traffic Management System (ERTMS), composed of a unique European Train Control System (ETCS) and radio system GSM-R, is designed to gradually replace the existing incompatible national systems throughout Europe.

 

The installation of the ERTMS along Freight Corridor F Aachen-Berlin-Warsaw-Terespol is a major project aiming to facilitate and increase the freight traffic between the EU's Central and Eastern Member States.

 

This project involves the trackside installation of the ERTMS/ETCS Level 1 and Level 2 system along the section Aachen-Oberhausen (120 km); the first part of the corridor located in Germany. This section will be operational by the end of 2012.

 


 

This project has been cancelled.

 

Budget:

 

National budget:

 

€9,000,000 

Total project cost covered by this Decision:

 

€18,000,000 

Percentage of EU support:

 

Works: 50%

EU contribution:

 

€9,000,000 

 

Download the Info Sheet about this project:

.pdf (351.7 KB)

 

This project was also looked at during the Mid-Term Review of the 2007-2013 TEN-T Multi-Annual Work Programme.

Click map to view enlarged version


Member States involved:

Germany

 

Implementation schedule:

Start date: January 2007

End date: December 2012

 

Beneficiary:

 Federal Ministry for Transport, Building and Urban Affairs (BMVBS)

 

Implementing body:

 DB Netz AG

 

Additional information:

 Coordinator’s Report of the Priority Project

 European Commission, DG MOVE




 See projects by country or transport mode

 

(Mailing address)
TEN-T Executive Agency
European Commission
W910
B-1049 Brussels
(Visiting address)
Chaussée de Wavre 910
B-1040 Brussels
Belgium