Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
|
Design studies regarding a two-lane railway bridge to improve the port access to the TEN-T Network
|
|
|
|
VDE 8.1, 4-track extension of the Eltersdorf-Paul Gossenstraße section
|
|
|
|
Hochrustung der Strecke Berlin - Halle/Leipzig (VDE 8.3) von ETCS Level 2 (SRS 2.2.2+) auf ETCS Level 2 (SRS 2.3.0d)
|
|
|
|
Construction of the second lock basin in Trier (Mosel)
|
|
|
|
Equipment of freight locomotives with ETCS on-board-units according to SRS 2.3.0.d
|
|
|
|
Equipment with electronic interlocking of the railway line between Emmerich (Dutch-German border) and Basel (German-Swiss border), within Corridor A Rotterdam-Genoa
|
|
|
|
New railway line (NBS) Ebensfeld-Erfurt: sections in Bavaria (BA 3121 Füllbachtal bridge, BA 3122 Fornbach bridge)
|
|
|
|
Expansion of Berlin Brandenburg International Airport
|
|
|
|
BAB A3, Frankfurt-Nürnberg, renewal of the bridge over the Main river at Randersacker
|
|
|
|
General planning of the rail-bound connections of the Port of Hamburg with Scandinavia and the Baltic Sea region
|
|
|
|
Preliminary planning for the electrification of Markt Schwaben-Tüßling-Freilassing
|
|
|
|
Studies for the removal of the level crossings on the section Oberhausen-Emmerich
|
|
|
|
Highway A3, 6-lane extension in the section AS Hösbach to Kauppenbrücke
|
|
|
|
Six-lane widening of the A8 federal highway Karlsruhe-Munich, in the section Pforzheim-Süd/Wurmberg to Heimsheim
|
|
|
|
Six-lane extension of the federal motorway A6 Walldorf-Weinsberg in the stretch of line Heilbronn/Untereisesheim-Weinsberg
|
|
|
|
Construction of the Bridge over the Hasel valley
|
|
|
|
Construction of the second lock basin in Fankel (Mosel)
|
|
|
|
Equipment of the Railion Deutschland AG locomotives
|
|
|
|
Equipment with ETCS of the railway section Emmerich (border)-Oberhausen as part of the Corridor A Rotterdam-Genoa
|
|
|
|
ETCS Trackside equipment of the first part (Aachen-Oberausen) of the German part of the Corridor F Aachen-Warsaw / Belarus
|
|
|
|
Works for construction and re-construction of the partially existing railway section between Karlsruhe and Basel
|
|
|
|
Studies and works for the upgrading of the high speed railway line Duisburg-Emmerich
|
|
|
|
Studies for the construction of the high speed section between Frankfurt and Mannheim
|
|
|
|
Studies for linking to Fehmarn belt fixed link between Lübeck-Puttgarden
|
|
|
|
Independent variant research on the development of the Danube between Straubing and Vilshofen
|
|
|
|
New construction of the rail bridge above the Danube at Deggendorf
|
|
|
|
Works for construction and modernisation of the section between Kehl - Appenweier
|
|
|
|
Works for the construction of the high speed line between Stuttgart and Wendlingen
|
|
|
|
Works and studies for upgrading of the section München - Mühldorf - Freilassing, cross-border section DE / AT
|
|
|
|
Works for the construction of a high speed line between Wendlingen and Ulm
|
|
|
|
Works for the construction of the high speed rail line section between Saarbrücken and Ludwigshafen
|
|
|
|
|
|
Works for the construction of the section between Erfurt and Halle/Gröbers
|
|
|
|
|
|
Studies for the Fehmarn belt Fixed Rail-Road Link
|
|
|
|
Preparatory Studies for the environmentally compliant crossing of the Elbe as part of the A20 near Glückstadt
|
|
|
|
Railway link Paris-East-France-South-West-Germany, Upgrade of the Ludwigshafen-Saarbrücken section
|
|
|
|
New high-speed line between Karlsruhe and Basel, partly with reconstruction of the existing line
|
|
|
|
North-South high speed line Berlin-Palermo, Section between Nuremberg and Ebensfeld, Part Nuremberg-Fürth
|
|
|
|
North-South high speed line Berlin-Palermo, Nodal point Berlin: Main and Südkreuz railway Stations
|
|
|
|
Upgrade of Augsburg-Olching section for high speed railway traffic
|
|
|
|
Studies for the new construction of the Stuttgart-Ulm high speed line
|
|
|
|
Planning for the upgrading of the railway connection line NL/D border Emmerich-Oberhausen
|
|
|
|
Study and implementation of the migration of the DB ERTMS/ETCS pilot project for installation in the Munich-Ingolstadt-Nurnberg section
|
|
|
|
Construction works on the A11 motorway Berlin-Polish border
|
|
|
|
New high speed line Leipzig-Dresden, Dresden hbf-Neustadt section
|
|
|