This action is part of the construction of intermodal terminal in Central North Planning Development Region in Bulgaria - Ruse" global project that aims to improve intermodality in the south-eastern region of the EU. It plans to create the conditions for the optimal combination and integration of various transport modes and a higher quality of freight transport services. This can pave the way for low-cost, high-volume freight transport from the Black Sea area to Central Europe and the EUN "poles" of trade. It will also allow new demands to be met, as the latest forecasts show a significant increase in traffic in regards to Turkey-Ukraine/Russia.
These studies aim to provide technical assistance for the preparation of the global project, and thus contribute to its timely and efficient implementation.
The project includes the preparation of a feasibility study together with all the necessary technical, economic and environmental evaluations; preparation of the conceptual design; development of procurement strategy and preparation of tender documentation for the construction works. Special attention shall be given to the development of logistic transport chain for multi-modal transport from the Black Sea to the Danube river, passing through the railway (Varna-Ruse).
This project has been cancelled.
|
Budget:
National budget:
€1,300,000
|
Total project cost covered by this Decision:
€2,600,000 |
Percentage of EU support:
Studies: 50%
|
|
EU contribution:
€1,300,000 |
Download the Info Sheet about this project:
.pdf (435.8 KB)
|
 |
 |
| Click map to view enlarged version |
Member States involved:
Bulgaria
Implementation schedule:
Start date: July 2008
End date: March 2010
Beneficiary:
Bulgarian Ministry of Transport
Implementing body:
National Railway Infrastructure Company
Additional information:
European Commission, DG MOVE
|