Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
|
Preparatory studies and activities of the RFC8 organisational structures Bremerhaven/Rotterdam/Antwerp-Aachen/Berlin-Warsaw-Terespol (Poland-Belarus border)/Kaunas for the corridor to become operational by 10 November 2015
|
|
|
|
Studies, managerial structures and activities for the establishment of Rail Freight Corridor 2
|
|
|
|
Air traffic management network integration and performance enhancement acceleration
|
|
|
|
Planning study for a new maritime lock in Terneuzen
|
|
|
|
Implementation of RIS on the Westerscheldt River II
|
|
|
|
Facilitating and speeding up ERTMS deployment
|
|
|
|
Simulation Environment for Fast ERTMS Validation
|
|
|
|
Study and implementation of major parts of the Corridor Freight Regulation 913/2010
|
|
|
|
|
|
On Shore Power Supply - an integrated North Sea network
|
|
|
|
Upgrade of the 10.000 tonnes-section of the sea canal Brussels-Scheldt near Willebroek, to improve its accessibility for sea-going vessels
|
|
|
|
Second sea lock Waaslandhaven (Port of Antwerp)
|
|
|
|
Additional studies in the Seine-Scheldt network in Flanders
|
|
|
|
Increase of under bridge-clearance on the Walloon section of Seine-Scheldt (PP-30) waterway network in order to allow continuous passage of containerships with up to three layers
|
|
|
|
The Albert Canal: lifting of bridges and upgrading to class VIb
|
|
|
|
Liège Carex: studies for railport construction at Liège Airport
|
|
|
|
Implementation of RIS in Flanders III
|
|
|
|
Greening European Transportation Infrastructure for Electric Vehicles
|
|
|
|
Deployment of Inland AIS transponders in Flanders and the Netherlands
|
|
|
|
Air Traffic Management Systems - Functional Airspace Block Europe Central (FABEC)
|
|
|
|
LNG infrastructure of filling stations and deployment in ships
|
|
|
|
MoS 24 - ICT based Co-modality Promotion Center for integrating PP24 into Mediterranean MoS
|
|
|
|
The Albert Canal - rebuilding the Briegden and Oel
|
|
|
|
Implementation of RIS in Flanders II
|
|
|
|
Retrofitment of locomotives with onboard ETCS equipment
|
|
|
|
Support to the ERTMS Consolidation
|
|
|
|
ERTMS implementation on the Railway Corridor C (Antwerpen-Lyon/Basel)
|
|
|
|
|
|
Airborne Datalink Equipment
|
|
|
|
Studies for the construction of three locks on the Upper-Scheldt
|
|
|
|
Study of the navigability of the 'Upper-Seascheldt' and the 'Southern Ghent Ring Canal' for class Va motor vessels (1500-3000 tonnage)
|
|
|
|
Rebuilding of Noorderlaanbridge
|
|
|
|
|
|
Study on the external costs and charging of the terrestrial modes on the Paris-Amsterdam corridor
|
|
|
|
Implementation of River Information Services in Europe - IRIS Europe II
|
|
|
|
Implementation of RIS on the
Westerscheldt river
|
|
|
|
Motorways of the Sea Esbjerg - Zeebrugge
|
|
|
|
Construction and elevation of railway bridges (HST lines 25 and 27) over the Nete river
|
|
|
|
Implementation of RIS in Flanders
|
|
|
|
ERTMS on-board equipment of Thalys locomotives
|
|
|
|
Deployment of ERTMS on the corridor Antwerp-Basel/Lyon
|
|
|
|
EEIG: ERTMS Users Group - testing activities
|
|
|
|
|
|
SESAR (Single European Sky ATM Research) Development Phase
|
|
|
|
Trans-European Satellite Navigation System (Galileo): Development and validation phase
|
|
|
|
PBKAL: F/B border, Bruxelles-Liège-B/D border, Bruxelles B/NL border: Belgian part of the northern European high speed network
|
|
|
|
EuroCap-Rail on the Brussels-Luxembourg-Strasbourg railway axis
|
|
|
|
Construction of a 225 x 25 m chamber navigation lock, its ancillary works and a pumping station / hydroelectric power plant on the Albert Canal, to the east of the existing lock complex at Lanaye
|
|
|
|
Studies for the construction of a 225m x 25m (Class VIb) lock in Huy (Ampsin-Neuville) and the works of a 225m x 25m (classe VIb) lock in Flémalle (Ivoz-Ramet), both on the Meuse river
|
|
|
|
Diabolo: Rail link of the Zaventem airport to the Thalys high speed network
|
|
|
|
ERTMS development and consolidation
|
|
|