Please note that the listing below is not exhaustive. More project information will be added as this website continues to be enhanced.
|
Air traffic management network integration and performance enhancement acceleration
|
|
|
|
|
|
Facilitating and speeding up ERTMS deployment
|
|
|
|
Study and implementation of major parts of the Corridor Freight Regulation 913/2010
|
|
|
|
TEN-T PP17: Salzburg-Vienna section, high speed extension of the Westbahn - works for the St. Polten freight train pass
|
|
|
|
TEN-T PP17: Salzburg-Vienna section, high speed extension of the Westbahn - Lambach-Breitenschutzung line improvements and works
|
|
|
|
TEN-T PP17: Salzburg-Vienna section, high speed extension of the Westbahn - closing the gap east of Amstetten station
|
|
|
|
|
|
Freight Terminal Wolfurt Planning
|
|
|
|
Studies on improving the Freight Corridor Concept by using Telematic Applications for Freight, and methods, tools and procedures developed by RNE for rail corridors
|
|
|
|
Greening European Transportation Infrastructure for Electric Vehicles
|
|
|
|
FAB CE Implementation of Static Area of Responsibility Scenario
|
|
|
|
Terminal Wien Inzersdorf Planing, (PP 17 Section: Vienna-Salzburg)
|
|
|
|
Intermodal Terminal Wörgl (TEN-T Priority Project 1 - Section Kufstein-Innsbruck)
|
|
|
|
Retrofitment of locomotives with onboard ETCS equipment
|
|
|
|
|
|
Airborne Datalink Equipment
|
|
|
|
ERTMS deployment on Corridor B (Stockholm-Naples) Austrian vehicles
|
|
|
|
ERTMS deployment on Corridor E (Dresden-Constanta) Trackside equipment
|
|
|
|
ERTMS deployment on Corridor E (Dresden-Constanta) Austrian vehicles
|
|
|
|
Four-track development of the Western Line, construction project Ybbs-Amstetten, Burgstaller Tunnel (skeleton construction)
|
|
|
|
Four-track development of the Western Line Vienna-Salzburg: gap closure St. Pölten-Loosdorf (freight rail bypass) bridge construction works
|
|
|
|
Four-track development of the Western Line Vienna-Linz: Melk railway station
|
|
|
|
|
|
Feasibility study on international rail real time traffic monitoring and electronic path request systems
|
|
|
|
Implementation of River Information Services in Europe - IRIS Europe II
|
|
|
|
Functional Airspace Block Central Europe - Implementation Plan
|
|
|
|
|
|
SESAR (Single European Sky ATM Research) Development Phase
|
|
|
|
Trans-European Satellite Navigation System (Galileo): Development and validation phase
|
|
|
|
Priority Project TEN no. 1 Brenner Base Tunnel Studies
|
|
|
|
Priority Project TEN no. 1
Brenner Base Tunnel Works
|
|
|
|
2007-AT-60450-P, ERTMS deployment on Corridor B (Stockholm-Naples) Austrian section
|
|
|
|
Implementation integrated river engineering project Danube East of Vienna
|
|
|
|
Works for the modernisation of the cross border section Salzburg German border
|
|
|
|
Works and studies for upgrading the Wien - Bratislava railway line
|
|
|
|
Works for construction of new high speed line between Kundl/Radfeld and Baumkirchen
|
|
|
|
ERTMS development and consolidation
|
|
|
|
Equipment of A Network with ETCS Level 1; Phase 1: Wien West Salzburg and Wels Passau
|
|
|
|
Prague-Linz-Maribor rail connection: technical, construction and alignment designs for the two tracks construction in section Werndorf South- Spielfeld (Sentilj)
|
|
|