Multi-Country
|
| PP 1 |
(2007-EU-01180-P) Priority Project TEN no. 1 Brenner Base Tunnel - works |
.pdf (841 KB) |
| PP 1 |
(2007-EU-01190-S) Priority Project TEN no. 1 Brenner Base Tunnel - studies
|
.pdf (824 KB) |
| PP 3 |
(2007-EU-03040-P) High speed railway line Paris-Madrid:section on Vitoria-Dax |
.pdf (811.7 KB) |
| PP 3 |
(2007-EU-03080-P) Studies and works for the high speed railway axis of southwest Europe (PP3) - Lisbon-Madrid axis: cross border section on Évora-Mérida |
.pdf (823.7 KB) |
| PP 3 |
(2007-EU-03110-P) Works for construction on of a high speed railway section between Perpignan and Figueras |
.pdf (804.3 KB) |
| PP 6 |
(2007-EU-06010-P) New Lyon-Turin rail link – Franco-Italian common part of the international section (studies and works) |
.pdf (1.7 MB) |
| PP 6 |
(2007-EU-06030-S) Cross border railway line Trieste/Divača: study and design of the Trieste-Divača-Ljubljana-Budapest-Ukrainian border |
.pdf (1.7 MB) |
| PP 16 |
(2007-EU-16010-S) Freight railway axis Sines-Madrid-Paris:new high capacity line through the Pyrenees |
.pdf (831.9 KB) |
| PP 19 |
(2007-EU-19010-P) Studies and works in the high speed rail interoperability in Iberian peninsula (PP19) - Porto-Vigo axis: cross border section Ponte de Lima-Vigo |
.pdf (829.3 KB) |
| PP 20 |
(2007-EU-20050-P) Fehmarn Belt fixed link |
.pdf (1.7 MB) |
| PP 22 |
(2007-EU-22070-S) Studies for the development of the railway Priority Project 22 |
.pdf (1.8 MB) |
| PP 24 |
(2007-EU-24090-S) “Iron Rhine” |
.pdf (304.2 KB) |
| PP 30 |
(2007-EU-30010-P) The Seine-Scheldt inland waterway network - cross border section between Compiègne and Ghent |
.pdf (854.1 KB) |
| ERTMS |
(2007-EU-60040-P) EEIG: ERTMS Users Group - testing activities |
.pdf (1.7 MB) |
| ERTMS |
(2007-EU-60120-P) ERTMS implementation on the railway Corridor D (Valencia-Budapest) |
.pdf (830.9 KB) |
| ERTMS |
(2007-EU-60400-P) ERTMS implementation on the railway Corridor D (Valencia-Budapest) |
.pdf (1.8 MB) |
| ERTMS |
(2007-EU-60410-S) Programme management offi ce for the ERTMS deployment on the corridor Rotterdam-Genoa |
.pdf (1.8 MB) |
| ERTMS |
(2007-EU-60440-P) ERTMS on-board equipment of Thalys locomotives |
.pdf (846.1 KB) |
| |
|
|
Austria |
| PP 1 |
(2007-AT-01130-P) Works for construction on of new high speedline between Kundl/Radfeld and Baumkirchen |
.pdf (836.5 KB) |
PP 17
|
(2007-AT-17040-P) Works and studies for upgrading the Wien-Bratislava railway line (6 sub-projects)
|
.pdf (823.5 KB) |
| PP 17 |
(2007-AT-17170-P) Works for the modernisation on of the cross-border section on Salzburg-German border
|
.pdf (1.7 MB) |
| PP 18 |
(2007-AT-18020-P) Implementation on integrated river engineering project Danube east of Vienna
|
.pdf (1.7 MB) |
| ERTMS |
(2007-AT-60450-P) ERTMS deployment on Corridor B (Stockholm-Naples) – Austrian section
|
.pdf (813.2 KB) |
| |
|
|
Belgium
|
| PP 2 |
(2007-BE-02030-P) Diabolo: Rail link of the Zaventem airport to the Thalys high speed network |
.pdf (1.8 MB) |
PP 18
|
(2007-BE-18040-P) Studies for the construction on of a 225 m x 25 m (Class VIb) lock in Huy (Ampsin-Neuville) and the works of a 225 m x 25 m (classe VIb) lock in Flémalle (Ivoz-Ramet), both on the Meuse river (2007-BE-18040-P)
|
.pdf (833.2 KB) |
| PP 18 |
(2007-BE-18070-P) Construction of a 225 x 25 m chamber navigation lock, its ancillary works and a pumping station / hydroelectric power plant on the Albert Canal, to the east of the existing lock complex at Lanaye |
.pdf (1.8 MB) |
| PP 28 |
(2007-BE-28050-P) EuroCapRail on the Brussels-Luxembourg-Strasbourg railway axis |
.pdf (849.3 KB) |
| |
|
|
Czech Republic |
| PP 22 |
(2007-CZ-22090-S) Geotechnical and design studies for the construction of new rail connection Praha-Beroun |
.pdf (823.7 KB) |
| PP 23 |
(2007-CZ-23020-S) Study for the upgrading of the railway line on the section Blazovice-Nezamyslice |
.pdf (772.4 KB) |
| ERTMS |
(2007-CZ-60010-P) Corridor E: Trackside equipment in the Czech Republic |
.pdf (816.8 KB) |
| ERTMS |
(2007-CZ-60020-P) ERTMS deployment on Corridor E (Dresden-Budapest): on-board equipment of Ceské dráhy, a.s. |
.pdf (853.7 KB) |
| |
|
|
Germany |
| PP 1 |
(2007-DE-01050-P) Works for the construction of the section between Erfurt and Halle/Gröbers |
.pdf (840.4 KB) |
| PP 2 |
(2007-DE-02020-P) Aachen-Köln |
.pdf (1.7 MB) |
| PP 4 |
(2007-DE-04020-P) Works for the construction of the high speed line section between Saarbrücken and Ludwigshafen |
.pdf (1.8 MB) |
| PP 17 |
(2007-DE-17010-P) Works for the constructi on of a high speed line between Wendlingen and Ulm |
.pdf (790 KB) |
| PP 17 |
(2007-DE-17020-P) Works and studies for upgrading of the section München-Mühldorf-Freilassing, cross border section DE/AT |
.pdf (817.1 KB) |
| PP 17 |
(2007-DE-17200-P) Works for the construction of the high speed line between Stuttgart and Wendlingen |
.pdf (1.7 MB) |
| PP 17 |
(2007-DE-17220-P) Works for construction and modernisation of the section between Kehl-Appenweier |
.pdf (820 KB) |
| PP 18 |
(2007-DE-18030-P) New construction of the rail bridge above the Danube at Deggendorf |
.pdf (1.2 MB) |
| PP 18 |
(2007-DE-18050-S) Independent variant research on the development of the Danube between Straubing and Vilshofen |
.pdf (1.7 MB) |
| PP 20 |
(2007-DE-20010-S) Studies for linking to Fehmarn belt fixed link between Lübeck-Puttgarden |
.pdf (842.4 KB) |
| PP 24 |
(2007-DE-24030-S) Studies for the construction of the section between Frankfurt and Mannheim |
.pdf (830.2 KB) |
| PP 24 |
(2007-DE-24040-P) Studies and works for the upgrading of the high speed railway line Duisburg-Emmerich |
.pdf (1.7 MB) |
| PP 24 |
(2007-DE-24060-P) Works for construction and re-construction of the partially existing railway section between Karlsruhe and Basel |
.pdf (1.8 MB) |
| ERTMS |
(2007-DE-60080-P) ETCS trackside equipment of the first part(Aachen-Oberausen) of the German part of the Corridor F Aachen-Warsaw/Belarus |
.pdf (1.8 MB) |
| ERTMS |
(2007-DE-60320-P) Equipment with ETCS of the railway section Emmerich-Basel as part of the Corridor A Rotterdam-Genoa |
.pdf (857.6 KB) |
| ERTMS |
(2007-DE-60490-P) Equipment of the Railion Deutschland AG locomotives |
.pdf (860.9 KB) |
| |
|
|
Denmark |
| PP 20 |
(2007-DK-20060-S) Studies for the capacity improvements of the section between Copenhagen and Ringsted |
.pdf (780.5 KB) |
| PP 20 |
(2007-DK-20070-S) Studies for upgrading the railway access lines to the future Fehmarn Belt fixed link - from Ringsted to Rødby and the intersection in Kastrup |
.pdf (800.5 KB) |
| |
|
|
Estonia |
| PP 27 |
(2007-EE-27010-S) Studies for a European gauge line for Rail Baltica (Estonian section) |
.pdf (1.7 MB) |
| PP 27 |
(2007-EE-27020-P) Cross border section Tartu-Valga railway reconstruction/upgrading |
.pdf (765.9 KB) |
| |
|
|
Finland |
|
| PP 12 |
(2007-FI-12010-P) Rail connection on from Kouvola to Kotka/Hamina ports, works for improving and construction on of a new railway yard |
.pdf (813 KB) |
| PP 12 |
(2007-FI-12040-P) Main railway connection on to Russian border, works for development of railway section on between Lahti and Vainikkala
|
.pdf (825.7 KB) |
| PP 12 |
(2007-FI-12050-P) Works for the development of the railway connection on between Helsinki airport and the PP12 lines
|
.pdf (821.3 KB) |
| |
|
|
France |
| PP 3 |
(2007-FR-03010-P) High speed railway line between Nîmes and Perpignan, works and studies for bypassing Nîmes and Montpellier |
.pdf (811.5 KB) |
| PP 3 |
(2007-FR-03120-P) High speed railway line Paris-Madrid: elimination of rail bottlenecks around Bordeaux |
.pdf (1.7 MB) |
| PP 3 |
(2007-FR-03130-S) High speed railway line Paris-Madrid: Bordeaux-Spanish border |
.pdf (817.3 KB) |
| PP 17 |
(2007-FR-17210-P) New railway high speed line “LGV Est” second phase: section Baudrecourt-Vendenheim |
.pdf (822.2 KB) |
| PP 24 |
(2007-FR-24070-P) Works for high speed line Rhine-Rhône - Eastern section |
.pdf (1.7 MB) |
| |
|
|
Greece |
| PP 7 |
(2007-EL-07020-S) Studies for the vertical access Thessaloniki-Serres-Promachonas |
.pdf (815.1 KB) |
| PP 7 |
(2007-EL-07040-S) Studies for the development of the motorway project of PP7 (Igoumenitsa/Patras-Athens-Sofia-Budapest motorway axis) |
.pdf (852.8 KB) |
| PP 29 |
(2007-EL-29010-S) Railway line between Antirrio and Ioannina, studies for designing of the new line Antirrio-Ioannina |
.pdf (829.1 KB) |
| PP 29 |
(2007-EL-29030-S) Studies for standardisation and upgrading design for the existing Patras-Pyrgos-Kalamata railway |
.pdf (818.5 KB) |
| |
|
|
Hungary |
| PP 6 |
(2007-HU-06100-S) Studies for preparation of approval of the railway line section Budapest-Keleti-Miskolc-Nyiregyhaza |
.pdf (823.3 KB) |
| PP 18 |
(2007-HU-18090-S) Improvement of the navigability on the Danube |
.pdf (1.7 MB) |
| PP 22 |
(2007-HU-22020-S) Preparation of design for approval for the railway line section Biatorbagy (incl.)-Tata (excl.) |
.pdf (1.7 MB) |
| |
|
|
Ireland |
| PP 26 |
(2007-IE-26010-S) Dublin interconnector tunnel study - design and railway order phase |
.pdf (794 KB) |
| |
|
|
Italy |
| PP 1 |
(2007-IT-01030-M) Southern access line to Brenner |
.pdf (1.8 MB) |
| PP 6 |
(2007-IT-06020-S) Section Ronchi Sud-Trieste: Priority Project 6 - national section |
.pdf (813.2 KB) |
| PP 24 |
(2007-IT-24010-S) Railway node of Genova - Study for upgrading the section Genova Voltri-Genova Brignole |
.pdf (809.6 KB) |
| ERTMS |
(2007-IT-60030-P) Migration towards ERTMS/ETCS for Trenitalia on-board equipment |
.pdf (841.5 KB) |
| ERTMS |
(2007-IT-60360-P) Trackside ERTMS equipment on Italian part of Corridor A (600 km) |
.pdf (843 KB) |
| |
|
|
Latvia |
| PP 27 |
(2007-LV-27050-S) Studies for a European gauge line (Latvian studies) |
.pdf (1.7 MB) |
| PP 27 |
(2007-LV-27060-P) 1) Reconstruction/upgrading: cross border sections north (Valmeira-Valka) and south (Jelgava-LT border) 2) Reconstruction/upgrading Jugla (Riga city border station)-Valmiera |
.pdf (292.8 KB) |
| |
|
|
Lithuania |
| PP 27 |
(2007-LT-27030-P) 1) Building of new European gauge line on the cross border section PL border-Marijampole 2) Cross border section Siauliai-LV border |
.pdf (1.7 MB) |
| PP 27 |
(2007-LT-27040-S) Studies for Rail Baltica, Lithuanian part |
.pdf (832.6 KB) |
| |
|
|
Luxembourg |
| PP 28 |
(2007-LU-28020-P) EuroCapRail: modernisation of the Brussels-Luxembourg-Strasbourg rail axis |
.pdf (1.7 MB) |
| |
|
|
The Netherlands |
| PP 5 |
(2007-NL-05020-P) Works for replacement of legacy systems by 15/25 kVAC on two remaining sections in The Netherlands of the railway corridor Rotterdam-Genoa |
.pdf (1.7 MB) |
| PP 18 |
(2007-NL-18010-P) Maasroute, upgrade of inland waterways from class Va to class Vb specifications |
.pdf (861.2 KB) |
| ERTMS |
(2007-NL-60060-P) ERTMS implementation on the railway corridor Rotterdam-Genoa-Netherlands part - Kijfhoek & Zevenaar |
.pdf (1.7 MB) |
| ERTMS |
(2007-NL-60160-P) Serial fitment of onboard ETCS equipment SRS 2.3.0 in 109 freight locomotives |
.pdf (842.8 KB) |
| ERTMS |
(2007-NL-60310-P) ERTMS implementation the Railway Corridor Rotterdam-Genoa-Netherlands part - Section Port Railway of Rotterdam |
.pdf (829.2 KB) |
| ERTMS |
(2007-NL-60380-P) Retrofit of 90 Siemens ES64F4 E-locomotives with Alstom ETCS L2 equipment for usage on EU freight corridors and various conventional networks |
.pdf (844.8 KB) |
| |
|
|
Portugal |
| PP 3 |
(2007-PT-03030-P) Studies and works in the high speed railway axis of southwest Europe (PP3) - Lisbon-Madrid axis: Third Tagus Crossing (TTC) |
.pdf (1.7 MB) |
| |
|
|
Sweden |
| PP 12 |
(2007-SE-12090-P) Works for construction of the road section Norra Lanken |
.pdf (1.7 MB) |
| PP 12 |
(2007-SE-12100-P) Works for construction of Malmö Citytunnel project |
.pdf (807.8 KB) |
| |
|
|
United Kingdom |
| PP 13 |
(2007-UK-13010-P) Package for improvements and upgrade of road infrastructure on Priority Project 13: sections of A14, M6 and A1 |
.pdf (1.3 MB) |