|
Construction of the Nimes and Montpellier stations on the new mixed high speed line of the Nimes and Montpellier (NJC) bypass
|
|
|
|
Railway bypass round the Lyon conglomeration Studies in preparation for the northern section implementation phase
|
|
|
|
Adaptation of the Port of Barcelona railway network to standard (UIC) gauge
|
|
|
|
Track bed works of the sub-sections Amorebieta/Etxano-Lemoa and LemoaGaldakao
|
|
|
|
Platform Works and services for follow-up works on subsection Amorebieta/Etxano-Amorebieta/Etxano
|
|
|
|
Works on the platform subsection Durango-Amorebieta/Etxano and services for follow up works
|
|
|
|
Track bed works of the sub-section Venta de Baños junction: Valladolid-Burgos and Leon-Palencia-Burgos connections and services for follow up works
|
|
|
|
Studies supporting the PPP programme for high speed rail implementation in Portugal
|
|
|
|
High speed railway line Basque country-French border. Drafting of design studies
|
|
|
|
PP High speed railway line Madrid-Lisbon. Sub-section Madrid Oropesa. Studies (phase 1)
|
|
|
|
Detailed design studies for the high speed railway section Poceirão-Évora, part of the Lisbon-Madrid axis
|
|
|
|
Detailed design studies for the high speed railway section Moita-Poceirão, part of the Lisbon-Madrid axis
|
|
|
|
Studies for the implementation of the Portuguese high-speed rail network PP3 and PP19
|
|
|
|
Implementation of the European Rail Traffic Management System on the high speed stretch between Lisbon and Caia, an integral part of the Lisbon-Madrid
|
|
|
|
Preparatory works for the implementation of the connection between the third Tagus crossing and the Oriente-Lisbon station
|
|
|
|
High speed railway line Paris-Madrid: section Mondragón-Elorrio
|
|
|
|
High speed railway line Madrid-Exremadura-Lisboa: studies and projects section Talayuela-Cáceres, phase II
|
|
|
|
High speed line Valladolid-Burgos-Vitoria. Track bed works for sub-sections: Nudo Norte de Valladolid-Cabezón de Pisuerga, San Martín de Valvení-Nudo de Venta de Baños y Torquemeda-Quintana del Puente
|
|
|
|
Corridor linking Madrid-Zaragoza-Barcelona-Figueras-Perpignan-Montpellier-Nimes: Railway bypass of Figueras
|
|
|
|
Upgrading of the Barcelona-France line and access for operating an international gauge
|
|
|
|
Studies and projects for the development of the rail section Talayuela-Cáceres
|
|
|
|
Studies and works in the high speed railway axis of southwest Europe (PP3) - Lisbon-Madrid axis: Third Tagus Crossing (TTC)
|
|
|
|
High Speed Railway Line Paris-Madrid: Bordeaux-Spanish border
|
|
|
|
High speed railway line Paris-Madrid: Elimination of rail bottlenecks around Bordeaux
|
|
|
|
High speed railway line between Nîmes and Perpignan, works and studies for bypassing Nîmes and Montpellier
|
|
|
|
High speed railway line Paris-Madrid: Section Abadiño-Durango
|
|
|
|
Works for construction of a high speed railway section between Perpignan and Figueras
|
|
|
|
Studies and works for the high speed railway axis of southwest Europe (PP3) - Lisbon-Madrid Axis: Cross-Border Section Evora-Merida
|
|
|
|
High speed railway line Paris-Madrid: Section Vitoria-Dax
|
|
|
|
High speed railway line Paris-Madrid: Section Arrazua/Ubarrundia Mondragón
|
|
|
|
High speed railway line Paris-Madrid: Valladolid-Burgos-Vitoria
|
|
|
|
High speed railway line Paris-Madrid: Valladolid-Burgos
|
|
|
|
High speed railway line Paris-Madrid: New Railway Network Guipúzcoano
|
|
|
|
TGV Sud: Nîmes-Montpellier-Perpignan section (preliminary studies) and terminal installations in the Perpignan-Figueras section
|
|
|
|
South Europe Atlantic high speed line - Angoulême-Bordeaux section- Studies
|
|
|
|
High Speed Railway Line Madrid-Barcelona-French border
|
|
|